INSTALLATION
17
Synthesis
06/40V GAS
4.9 CHECKING BEFORE STARTING WORK
After completing installation of the unit a series of checks must be carried out, listed as
follows:
check that the various disassembled parts have been assembled;
check the power cable;
check that the control panel is working;
check the integrity of the jointing for gas supply and exhaust tubes;
check that the apertures for ventilating the room are adequate;
check the nominal capacity of the oven while it is functioning at the exit point of the solenoid
valve;
If present, check that the ventilation hood is working.