2
0
Reset to Factory Default
Press and Hold
“PROG” button for 3 seconds on AC Master, the
Green Indicator will light up. DO NOT Release the
“PROG”
Button until Green Indicator flashes TWICE.
Important
: ZXT-510 will not implement the reset to factory
default when the battery level equal or below 50%
Remark : All the setting and data will be permanently deleted.
Please use this procedure only when the network primary
controller is missing or otherwise inop- erable.
Mounting
Required tools and supplies
• Phillips Screwdriver
• Drill
• Drill bit (3/16” for drywall, 7/32” for plaster)
• Hammer
• Pencil
• Level (optional)
• AA Alkaline Battery 2pcs (Not Included) or 5VDC 1A Power
Adap- tor with 1.5m long Micro USB Cable (Not Included)
CAUTION
• Use new batteries of the recommended type and size only
• Never mix used and new batteries together
• To avoid chemical leaks, remove batteries from the ZXT-510 if
you do not intend to use the device for an extended period of
time.
• Dispose of used batteries properly; do not burn or bury them.
Summary of Contents for AC MASTER LITE
Page 1: ...ZXT 510 AC MASTER Lite INSTALLATION GUIDE...
Page 2: ......
Page 4: ...2 Caution 23...
Page 6: ...4 Product Overview...