FIG. 11
PLACE FURNACE
Review all instructions in the Planning Your
Installation section. Place the furnace in the pre-
selected location.
Refer to Figs. 4 & 5 (on pages 14 and 15 ) in the
Planning Your Installation section. Make sure the
furnace is level.
SECONDARY AIR INTAKE COVER
1. Remove secondary air intake cover from
accessory package and align over mounting
holes located above fire door assembly on face
of furnace. See Fig. 11.
2. Insert 12 ea. # 10 x 3/4 hex HD drill screws
(furnished with cover) through mounting holes
and tighten.
SECONDARY AIR SHUT OFF
MODELS LWO-112 & LWG-112 ONLY
1. Remove round secondary air shut off disc from
plastic bag.
2. Screw the shutoff disc to the intake cover just
installed.
Opening the disc when burning wood/coal,
provides room air to the round perforated tubes
between the top and bottom row of firebrick,
thereby causing secondary combustion of the
unburned wood/coal gases as they leave the initial
flame. This patented feature increases wood/coal
burning efficiency up to 40% while reducing
smoke and creosote. When burning gas or oil for
extended periods of time, this disc should be
closed.
It is not necessary to provide this shutoff disc on
models LWG-168 and LWO-168. Maximum
efficiency is achieved without this disc.
FIG. 10
SMOKE
PIPE
RETURN AIR
PLENUM
WARM AIR
PLENUM
DS-103 DAMPER
CONTROL
24-VOLT
TRANSFORMER
19
FUME SENSOR
(GAS MODEL ONLY)
Installation
YUKONTROL DS-103 DAMPER CONTROL
NOTE
:
Refer to the wiring diagrams section in this
manual.
Remove control from accessory box and install as
follows
:
1. Remove the four screws that hold the gasket to the
DS-103 damper control.
2. Mount the DS-103 damper control to the draft tube
using screws removed above. Make sure gasket
stays in place. See Fig. 11
3. Loosen the two screws located at slotted end of
draft tube, and remove remaining 10 screws. Make
sure gasket stays in place.
4. Mount DS-103 damper control and draft tube
assembly to furnace as shown. See Fig. 11
5. The electrical connections will be completed later in
the Installation Instructions.
FIG. 12
SECONDARY AIR INTAKE COVER
DS-103
DAMPER
CONTROL
Summary of Contents for LWO-112
Page 9: ...9 Furnace Features Eagle I Husky...
Page 11: ...11 Furnace Features Eagle II Polar...
Page 31: ...OIL AND WOOD COAL HEATING WITH A C 31 Wiring Diagrams DS 103 DAMPER CONTROL...
Page 32: ...GAS AND WOOD COAL HEATING ONLY 32 Wiring Diagrams DS 103 DAMPER CONTROL...
Page 33: ...GAS AND WOOD COAL HEATING WITH A C 33 Wiring Diagrams DS 103 DAMPER CONTROL...
Page 56: ...EAGLE I HUSKY MODELS LWO 112 LWG 112 56 Exploded Views Parts Lists...
Page 58: ...EAGLE II POLAR MODELS LWO 168 LWG 168 58 Exploded Views Parts Lists...
Page 62: ...WAYNE MODEL P250AF DIN GAS BURNER 62 Exploded Views Parts Lists...