background image

visit us @ www.ardaappliances.com

pg 6

Before You Start...

1.  Read this manual carefully and completely.

2.  ARDA range hoods conform to ETL/CSA standards. 

WůĞĂƐĞĐŚĞĐŬLJŽƵƌůŽĐĂůďƵŝůĚŝŶŐĐŽĚĞƐĨŽƌĂŶLJĂĚĚŝƟŽŶĂů
ƌĞƋƵŝƌĞŵĞŶƚƐ͘

3.  The appliance has been manufactured as class I, there-

ĨŽƌĞŐƌŽƵŶĚĐŽŶŶĞĐƟŽŶŝƐŶĞĐĞƐƐĂƌLJ͘ϭϭϱsƉůƵŐŝƐ

provided. The range hood must be installed so that that 
the plug is easily accessible.

4.  This appliance has been designed for use in both ducted 

ĂŶĚƌĞĐŝƌĐƵůĂƟŶŐŵŽĚĞƐ͘&ŽůůŽǁƚŚĞĂƉƉƌŽƉƌŝĂƚĞŝŶƐƚĂůůĂ

-

ƟŽŶŵĞƚŚŽĚ͘

I

ŶƐƚĂůůĂƟŽŶ/ŶƐƚƌƵĐƟŽŶƐ

 

Planning Your Installation

1. 

DĞĂƐƵƌĞƚŚĞŇŽŽƌƚŽĐĞŝůŝŶŐŚĞŝŐŚƚ͘

This hood can be installed on walls 
between 8” and 9” tall. 

2. 

&ŝŶĚƚŚĞĐĞŶƚƌĞƉŽŝŶƚŽĨLJŽƵƌƌĂŶŐĞͬ

cooktop. Drop a plumb line from 
your ceiling to this point on your 
cooking surface. 

DĂƌŬƚŚĞĐĞŝůŝŶŐ

ǁŚĞƌĞƚŚĞƉůƵŵďůŝŶĞƐƚĂƌƚƐ͘

3. 

Around this point, install cross brac-

ing between the ceiling joists for 
the island hood to mount to.

4. 

Check your range/cook-top 

User 

Manual

ĨŽƌƚŚĞƐƉĞĐŝĮĞĚŵŝŶŝŵƵŶ

and maximum distance above your 
cooking suface.  The minimum 
distance between any element or 

ŇĂŵĞŚĞŝŐŚƚĂŶĚƚŚĞŶĞĂƌĞƐƚĐŽŵ

-

bustable surface is 61cm (24”).  

5. 

Decided where the ductwork will 

run between the hood and the out-
side. Short, straight duct runs will 

ƉƌŽǀŝĚĞƚŚĞŵŽƐƚĂŝƌŇŽǁ͘

Floor to
ceiling

Center of
cooking 
surface to 
ceiling

Ceiling duct opening

Ceiling joists & 
cross-bracings

/^>EDKhEd,KK^

Reviews: