5188236-BIM-A-0316
Johnson Controls Unitary Products
11
Figure 9: ZD-03 Thru -05 Unit Side Duct Openings
Figure 10: ZD-03 Thru -05 Roof Curb
Table 5:
ZD-03 Thru -05 Utilities Entry
Hole
Opening Size (Dia.)
Used For
A
7/8” KO
1
1. Opening in the bottom to the unit can be located by the slice in the
insulation.
Control Wiring
2
2. Do not remove the 2” knockout ring.
Side
Bottom
B
2” KO
1
Power Wiring
Side
Bottom
C
1-5/8” KO
Gas Piping (Front)
D
1-1/2” KO
Gas Piping (Bottom)