
JOHNSON CONTROLS
90
SECTION 5 - TECHNICAL DATA
FORM 201.28-NM1.1
ISSUE DATE: 1/31/2018
ELASTOMERIC ISOLATOR INSTALLATION
Read the following instructions before beginning
installation.
1. Isolators are shipped fully assembled and are to be
positioned in accordance with the submittal draw-
ings or as otherwise recommended.
2.
Set isolators on floor, housekeeping pad or sub
-
base, ensuring that all isolators lines match the
equipment mounting holes. The VMC group
recommends that the isolator base (A) be installed
on a level surface. Shim or grout as required,
leveling all isolator bases to the same elevation
(0.03125 of an inch maximum difference can be
tolerated).
3. Bolt or anchor all isolators to supporting structure
utilizing base thru holes (B).
4. Remove top bolt and top washer. Place equip-
ment on top of isolators so that mounting holes in
equipment or base line up with threaded hole (C).
5. Reinstall top bolt and washer and tighten down.
LD13762C
D
D
CL
SECTION D-D
CL
(B)
(B)
(A)
(C)
TOP BOLT
TOP WASHER
SECTION D-D
Summary of Contents for YVAA
Page 4: ...JOHNSON CONTROLS 4 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 12: ...JOHNSON CONTROLS 12 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 24: ...JOHNSON CONTROLS 24 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 96: ...JOHNSON CONTROLS 96 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 174: ...JOHNSON CONTROLS 174 FORM 201 28 NM1 1 ISSUE DATE 1 31 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 177: ...JOHNSON CONTROLS 177 FORM 201 28 NM1 1 ISSUE DATE 1 31 2018 NOTES...