
Pre-rotation vanes calibration screen
Figure 13: Pre-rotation vanes calibration screen
This screen displays a cutaway view of the chiller compressor, revealing the pre-rotation vanes and
provides the capability of calibrating the pre-rotation vanes. The appearance of this screen is the
same for compressor #1 and compressor #2.
Note:
Requires a login access level of SERVICE.
Table 24: Display only fields
Field/LED name
Description
PRV opening (LED)
Illuminates when the vanes are opening.
PRV closing (LED)
Illuminates when the vanes are closing.
Calibration in progress (LED)
Indicates the calibration sequence is in progress.
Calibration messages
These are text messages which step the user through the calibration process and
indicate its success or failure.
PRV feedback voltage
Displays the pre-rotation vanes position potentiometer feedback voltage.
Vane motor switch (LED)
Lights when the vane motor switch is closed.
Table 25: Programmable
Button
Access level
Description
Open
Service
Sets the PRV control to Manual and drives the PRV in the open direction.
Close
Service
Sets the PRV control to Manual and drives the PRV in the closed direction.
Hold
Service
Stops the PRV at the present position.
Auto
Service
Returns the PRV control to Automatic program control.
Start calibration Service
Initiates the PRV Calibration sequence. This option is hidden after calibration has
started.
Cancel calibration Service
This option only becomes available after calibration has started.
Table 26: Navigation
Button
Access level
Description
Home
Service
Returns to the Home screen.
Compressor
Service
Returns to the Compressor screen.
Model YD Mod D with OptiView Control Center
46
Summary of Contents for YD Mod D
Page 2: ...2 Model YD Mod D with OptiView Control Center...
Page 8: ...Nomenclature Model YD Mod D with OptiView Control Center 8...
Page 17: ...Figure 2 Chiller operation flow chart 17 Model YD Mod D with OptiView Control Center...
Page 18: ...Figure 2 Chiller operation flow chart Model YD Mod D with OptiView Control Center 18...
Page 19: ...Figure 2 Chiller operation flow chart 19 Model YD Mod D with OptiView Control Center...
Page 20: ...Figure 2 Chiller operation flow chart Model YD Mod D with OptiView Control Center 20...
Page 21: ...Figure 2 Chiller operation flow chart 21 Model YD Mod D with OptiView Control Center...
Page 22: ...Figure 2 Chiller operation flow chart Model YD Mod D with OptiView Control Center 22...
Page 150: ...Figure 57 Sample printout status Model YD Mod D with OptiView Control Center 150...
Page 151: ...Figure 57 Sample printout status 151 Model YD Mod D with OptiView Control Center...
Page 152: ...Figure 58 Sample printout setpoints Model YD Mod D with OptiView Control Center 152...
Page 153: ...Figure 58 Sample printout setpoints 153 Model YD Mod D with OptiView Control Center...
Page 154: ...Figure 59 Sample printout schedule Model YD Mod D with OptiView Control Center 154...
Page 155: ...Figure 60 Sample printout sales order 155 Model YD Mod D with OptiView Control Center...
Page 156: ...Figure 61 Sample printout history Model YD Mod D with OptiView Control Center 156...
Page 157: ...Figure 61 Sample printout history 157 Model YD Mod D with OptiView Control Center...
Page 159: ...Figure 64 Sample printout custom screen report 159 Model YD Mod D with OptiView Control Center...