
INSTALLATION, OPERATION & MAINTENANCE
CS2000 BELT DRIVE
AIR HANDLING UNITS
New Release
Form 115.27-NOM1 (200)
TABLE OF CONTENTS
PRE-START UP
Receiving and Inspecting ............................................................................ 2
Unit Rigging and Placement ........................................................................ 2
Clearance ..................................................................................................... 2
Pre-start up Check ....................................................................................... 2
INSTALLATION
Thru-Rod Connection (Figure 1) ................................................................. 3
Thru-Rod Connection / Base Rail (Figure2) ................................................ 3
External Rods / Base Rail (Figure 3) ............................................................ 3
Field Wiring ................................................................................................. 4
Belt Tensioning ........................................................................................... 4
Belt Deflection Force (Table 1) .................................................................... 5
Replacement Parts ....................................................................................... 5
Piping .......................................................................................................... 5
Condensate Drain and Traps (See Figures 5A – 5E) .................................. 6
MAINTENANCE
Bearing Re-lubrication ................................................................................. 7
General Maintenance (Table 2) ................................................................... 7
Set Screw Tightening (Table 3) ................................................................... 7
00297VIP
00298VIP