
<11. Inspection and Maintenance>
11-11
IM 11M13A01-04E
11.3 Replacement of Flowmeter for Automatic
Calibration Unit
(1) Remove pipe holding piping fitting
(2) Remove bolts holding flowmeter, and replace it. A white back plate (to make the float easy to
see) is attached. The end of the pin holding down the back plate must be on the bracket side.
(3) Replace piping, and fix M6 bolts between brackets. *1
*1 : When disassembling and reassembling, mark original positions, and tighten an extra 5-10° when reassembling.
After tightening, do a liquid leakage test.
Vertical mounting
Horizontal mounting
C
C
B
B
C'
B'
A'
A
A
F11-10E.ai
Connect piping pairs A-A’, B-B’, C-C’, D-D’
Fixing screw pairs
Flame Arrestor
Flame Arrestor
Fitting
Flame Arrestor
Fitting
Fitting
Figure 11.10 Fixing Flowmeter
WARNING
Do not loosen or remove any Flame Arrestor of gas inlet/outlet during piping.
The detector modification or parts replacement by other than authorized representative of Yokogawa
Electric Corporation is prohibited and will void ATEX Flameproof Certification, FM Explosion-proof
Approval and CSA Explosion-proof Certification.
Summary of Contents for ZR202S
Page 12: ...xi IM 11M13A01 04E Introduction ...
Page 18: ...Blank Page ...
Page 61: ...Blank Page ...
Page 129: ...Blank Page ...
Page 141: ...Blank Page ...
Page 153: ......
Page 155: ......
Page 157: ......
Page 159: ...Blank Page ...
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......