
<2. INSTALLATION, PIPING, AND WIRING>
2-4
IM 12B01B30-02EN
1st Edition : Mar. 08, 2023-00
*1: Option /L (Air denoising for Low Range)
*2: You should install a check valve before the tap water pipe to prevent backflow.
Head tank
Manual valveV1
Pinch
valve
SV4
Manual
valve V2
Manual valve
V3
Zero turbidity filter
Sample (VP16)
Tap water (VP16) *2
Drain (VP40)
PVC tray
*1
Detector
Manual valve
V4
Solenoid valve
SV2
Figure 2.2
-A2 With sampling system (with auto cleaning, without auto zero calibration)
Head tank
Manual valveV1
Manual valve
V4
Pinch
valve SV4
Solenoid valve
SV2
Solenoid
valve SV3
Solenoid valve
SV1
Manual
valve V2
Manual
valve V3
Zero turbidity filter
Sample (VP16)
Tap water (VP16) 2*
Drain (VP40)
PVC tray
1*
Detector
1*: Option /L (Air denoising for Low Range)
M
2*: You should install a check valve just before the tap water pipe to prevent backflow
Figure 2.3
-A3 With sampling system (with auto cleaning, with auto zero calibration)
(1) Sample piping
This piping is used to feed the sample to the detector.
The pressure condition of the sample is 20 to 500 kPa, and the flow rate is 2 to 10 L/min .
The pipe joints are rigid PVC pipes with a nominal diameter VP16 (O.D. ø22mm). Before
piping, install any fittings that match the pipe diameter, such as unions or flanges.
Summary of Contents for TB830D
Page 7: ...Blank Page ...
Page 29: ...Blank Page ...
Page 35: ...Blank Page ...
Page 51: ...Blank Page ...
Page 75: ...Blank Page ...
Page 85: ...Blank Page ...