
ix
IM 704610-01E
Flowchart of Operation
The figure below is provided to familiarize the first-time user with the general flow of the
TA220 operation. For a more detailed description of each item, see the relevant section.
Preparing the Instrument
Preparing the Instrument
Entering Measurement Conditions
Entering Measurement Conditions
Signal Output
Signal Output
Installing the instrument
Connecting the power supply and
turning the power switch ON and OFF
Connecting cables and a probe
• Measurement function and polarity
• Input impedance and input coupling
• Equalizer
• Trigger mode and slice level
• Gate time
• Arming
• Block sampling
• Inhibit
• Other (as needed)
• DC output of jitter ratio
• DC output of RF signal voltage level
• Other signal output
Section 3.2
Section 3.3,
Section 3.4
Section 3.5
Section 3.6
Section 4.1
Section 4.2
Section 4.3
Section 4.4
Section 4.5
Section 4.6
Section 4.7
Section 4.8
Section 4.9
Section 7.1
Section 7.2
Section 7.3
Displaying Measurement Results
Displaying Measurement Results
• Meter (needle)
• Numerical values
• Determination
Section 5.1
Section 5.2
Section 5.3