IM 01E20D01-01E
Edition
Date
Page
Revised Item
6th
Oct. 2005
3-22 to 3-24
Added the "Confirmation of adapter mounting screw"
5-1
(7)
Added the sentence.
5-5
Added the note of installation
6-7
Added the note of permeable fluids to the grounding ring/grounding
electrode.
6-12
Added the "IECEx" to the hazardous area classification.
6-14
Added the "SF2 (IECEx)" to the withstand voltage.
6-21 to 6-27
Changed the note for wetted parts material.
6-28
MU
Changed description of the "mass unit setting (MU)".
6-29
PM
Changed the value of the mirror finished PFA lining (PM).
Changed from "Ra 0.05 to 0.15
µ
m" to "Size 15 to 200 mm :
Ra 0.05 to 0.15
µ
m, Size 250 to 400 mm : Ra 0.05 to 0.25
µ
m"
6-31
SF2
Added the "IECEx Certification (SF2)" to the optional specifications.
6-39
Corrected the "Weight kg (lb)" of BD4.
6-40
Corrected the "Weight kg (lb)" of BJ1/CJ1, BJ2/CJ2 and BG1/CG1.
6-48
Corrected the "Inner diameter of grounding ring (ød)" of size 250mm.
8-7 to 8-8
8.5
Added the "IECEx".
7th
June 2006
1-1
Added the postscript about F
OUNDATION
Fieldbus protocol type.
3-11
Table 3.3.7 Changed the Torque Value.
3-12
Table 3.3.8 Changed the Torque Value.
3-13
Table 3.3.9 Changed the Torque Value.
3-16
Table 3.3.14 Changed the Torque Value.
3-17
Table 3.3.15 Changed the Torque Value.
3-18
Table 3.3.16 Changed the Torque Value.
3-22
5)
Added the sentence.
3-23
5)
Added the sentence.
3-24
5)
Added the sentence.
Changed the Figure 3.3.10.
4-3
(2)
Added the postscript about F
OUNDATION
Fieldbus protocol type.
4-6
(6)
Added the postscript about F
OUNDATION
Fieldbus protocol type.
4-13
1), 2)
Added the “IECEx”.
5-5
5.3
Added the CAUTION.
Changed the Figure 5.3.1.
5-8
5.4.3
Added the postscript about F
OUNDATION
Fieldbus protocol type.
5-9
5.5.1
Added the postscript about F
OUNDATION
Fieldbus protocol type.
5-10
5.5.2
Added the postscript about F
OUNDATION
Fieldbus protocol type.
6-1, 14, 20, 28
Added the postscript about F
OUNDATION
Fieldbus protocol type.
6-7
Corrected from “SPCC” to “SS400” in Housing of size 500 mm to
2600 mm
6-17 to 20
Corrected the value of Pressure on figure.
6-21 to 6-23
Added the “-F” (F
OUNDATION
Fieldbus protocol).
6-25 to 6-27
Added the “-F” (F
OUNDATION
Fieldbus protocol).
6-34 to 6-48
Added the postscript about F
OUNDATION
Fieldbus protocol type.
REVISION RECORD
Title: AXF Magnetic Flowmeter Integral Flowmeter/Remote Flowtube
[Hardware Edition]
Manual No.: IM 01E20D01-01E