< 9. Calibration >
9-6
IM 11M12D01-01E
9.2.4 Span Gas Concentration
This sets the oxygen concentration of the span gas used for calibration. When the instrument air
supply is used as the span gas, enter 21% O
2
.
From the [Calibration setup] display, select [Span gas conc], and the numerical data entry display is
displayed. Enter the oxygen concentration of the span gas used for calibration. For example, enter 21
vol% O
2
as [02100].
NOTE
When the instrument air supply is to be used as span gas, cool it to -20º C below dew point to remove
moisture, oil mist and dust from the air. If you do not do this to purify the air, then the accuracy of the
measurement may be affected.
9.2.5 Calibration Time Setting
If the mode is [Manual]:
Select [Hold time]. This is the output stabilization (settling) time required from calibration end until
measurement mode is reentered. During this time, the calibration gas is switched to measurement
gas and the measurement is allowed time to stabilize. Setting range of Hold time is from 00min. 00
sec. to 60 min. 59 sec. The analog outputs of individual channels which are under calibration remain
in Output Hold status from the start of calibration until the end of the stabilization (settling) time, and
their output is not included in averaging group calculations during this time.
If the mode is [Semi-Auto]:
In addition to the above [Hold time] output stabilization (settling) time, there is also a [Cal. time] setting.
This is the settling time from when calibration gas flow is started until calibration is performed. The
same time setting is used for both Zero and Span calibration.
Setting range is from 00min. 00 sec. to 60 min. 59 sec. Calibration time and stabilization time, and
analog output status are shown on the calibration timing chart of Figure 9.6 below. For Solenoid Valve
(SV) piping and wiring see Section 4.2 (Piping for a System to Perform Automatic Calibration).
If the mode is [Auto]:
In addition to the above [Hold time] output stabilization (settling) time and [Cal. time] setting, there is
also calibration [Interval], [Start date] and [Start time]. The Automatic Calibration Interval can be set in
the range 00 days 00 hrs. to 255 days 23 hrs. Once Automatic Calibration starts, it is performed for all
installed channels, so the interval needs to be larger than the sum of span and zero calibration times
plus settling times for all channels.
The Start date and Start time are for the first calibration in the Automatic Calibration cycle (repeated at
the calibration Interval). To set 2004 June 21, at 1:30 pm, set Start date to YY:04, MM:06, DD:21 and
Start time to HH: 13, MM: 30
Summary of Contents for av550g
Page 17: ...Blank Page ...
Page 45: ...Blank Page ...
Page 71: ...Blank Page ...
Page 203: ......
Page 205: ......
Page 207: ......
Page 209: ......
Page 211: ......
Page 213: ...Blank Page ...