YG48Q-5A Maintenance ManualRemoval and installation of engine
49
10.
Removal of engine;
Loosen the nut and remove the lower hanging
bolt.
Move the engine slowly from the right.
Installation of engine
The installation of engine is in the reverse order of
removal of engine.
During installation, note that the wiring of cable shall be in
strict accordance with the wiring diagram.
Summary of Contents for YG48Q-5A
Page 38: ...YG48Q 5AMaintenance ManualFuel system 41 4 Fuel system...
Page 92: ...YG48Q 5AMaintenance ManualFrame and exhaust system 105 10 Frame and exhaust system...
Page 123: ...YG48Q 5A Maintenance ManualIllumination signal system 136 Circuit schematic drawing...
Page 126: ...YG48Q 5A Maintenance ManualIllumination signal system 139...
Page 133: ...YG48Q 5A Maintenance ManualEngine management system 146 Major parts and components...
Page 134: ...YG48Q 5A Maintenance ManualEngine management system 147...
Page 144: ...YG48Q 5A Maintenance ManualElectrical System Diagram 157 19 Electrical System Diagram...