background image

 

13

ASSEMBLY INSTRUCTIONS 

 

Toolbar Hanger Assembly 
 
STEP 12.  

Install the 2 ½” x 8” hydraulic cylinder base end and clevis to the toolbar hanger using the 6 5/8” cylinder 

pin and 3/16” x 2” cotter pins.  Attach the rod end of the cylinder to the coulter toolbar cylinder lug using the 3 ¾” pin 
and 2) 7 ga. hairpin clip. 

 

 

STEP 13.  

Remove the port plugs from the 2 ½” x 8” hydraulic cylinders and install the 90 deg. hose fitting.  Attach 

the 3/8” x 22” hose to each fitting.  Connect the two hoses attached to the base end of the cylinders using a tee hose 
fitting and also connect the hoses attached to the rod end of the cylinders.  Now connect the 3/8” x 150” hoses to the 
tee fittings and route the hoses toward the drawbar clevis.  Install the tip adaptors to the tractor end of the 3/8” x 150” 
hoses. 

 

 
 
 
 

Summary of Contents for 6300

Page 1: ...R S MANUAL MODEL 6300 COULTER CART 2565 330_REV_C 07 18 YETTER MANUFACTURING CO FOUNDED 1930 Colchester IL 62326 0358 Toll free 800 447 5777 309 776 3222 Fax Website www yetterco com E mail info yette...

Page 2: ...the user to read the operator s manual and comply with the safe and correct operating procedure and to lubricate and maintain the product according to the maintenance schedule in the operator s manual...

Page 3: ...tained from your local Yetter dealer WARNING Never clean lubricate or adjust a machine that is in motion Always install the transport lock pins and bracket when transporting for any length of time or...

Page 4: ...y tightened bolts will result in damage breakage expense and down time 2 Always replace bolts with the specified grade and type 3 Torque properly before first use of the machine and every 2 4 hours of...

Page 5: ...embled Attach the outside wheel and hub assemblies 6600 146 by inserting the spindle shaft into the tube welded to the bottom of the lift wheel insert using 1 x 3 hex bolt and hex lock nut STEP 2 Chec...

Page 6: ...attach the toolbar depth indicator 6300 347 Position the assembly on the center frame with 6300 212 toolbar flange plate w a hook over the drawbar flange plate Torque the 1 bolts to 670 ft lbs STEP 2...

Page 7: ...4 Align the center of the coulter toolbar with the center of the frame Attach the 5 x 5 toolbar to the rear of the hanger bar using the offset brackets u bolts and lock nuts Rigidly fasten one bracket...

Page 8: ...8 ASSEMBLY INSTRUCTIONS LOCATIONS FOR OFFSET BRACKETS...

Page 9: ...width by two and chalk mark that distance for the first coulter on each side of the centerline Now mark the rest of the toolbar for the coulter location measuring from the two center coulters See exam...

Page 10: ...k using 4 x 8 bolts 2 shank clamp castings and lock nuts For crop residue flow through the coulter it is best to mount the coulters alternating to the front and to the backside of the toolbar NOTE It...

Page 11: ...th the lower portion of the offset shank forward to be mounted on the front of the toolbar and assemble the remaining coulters with the offset shank backward to be mounted on the rear of the toolbar S...

Page 12: ...o the coulter hub using 4 x 1 carriage bolts lock washers and hex nuts Rotate the blades checking for wobble and clearance If blade wobble is excessive check for burrs on hub mounting surface or loose...

Page 13: ...7 ga hairpin clip STEP 13 Remove the port plugs from the 2 x 8 hydraulic cylinders and install the 90 deg hose fitting Attach the 3 8 x 22 hose to each fitting Connect the two hoses attached to the b...

Page 14: ...frame Bolt in the double bar extension 6300 209 and reattach the drawbar using the 1 x 3 hex bolts and 1 locknuts Torque to 400 ft lbs STEP 3 Mount the additional hanger assembly on the tongue extens...

Page 15: ...the gauge wheel bracket by installing the jack from the front The decal strap needs to be between the depth indicator and the bracket Secure the jack assembly with 2 x 4 eyebolts 2 x 4 hex bolts and h...

Page 16: ...cardboard or wood rather than hands to search for suspected leaks Failure to heed may result in personal injury or death The Yetter coulter cart requires two remote hydraulic valves on the tractor fo...

Page 17: ...ge air from the system 6 Recheck tractors fluid level and refill if necessary 7 Cycle cylinders back and forth a couple of times to see that they operate together Hold the lever in the extended positi...

Page 18: ...f the left cart cylinder 4 x 20 STEP 2 Plumb the DROP LOWER hydraulic hose of the marker system to the bottom end of the right cart cylinder 3 x 20 NOTE After purging the hydraulic system of air Check...

Page 19: ...ns and 7 ga hairpins Connect the adjustable top link of the cart to the lower hole in the center anchor of the implement Lock the jam nut when the leveling adjustments are completed Proper operation o...

Page 20: ...t tires with fluid to add weight to the rear of the cart forcing the coulters to cut The spring adjustment nut on the coulters can also be tightened Also an optional weight kit 6300 129 10 suitcase we...

Page 21: ...heck and adjust transport wheel rollers if necessary every 100 hours To adjust transport wheel rollers loosen roller bolts and adjust bolts as necessary to eliminate transport wheel wobble Ensure the...

Page 22: ...SEMBLY 9 4 6600 368 ROLLER BUSHINGS 10 4 6600 208 4 X 4 ROLLER 11 4 6600 369 ROLLER BOLT WITH ZERK 12 4 6600 127 ROLLER ADJUSTMENT ASSEMBLY 13 2 6600 382 LIFT WHEEL PIN ZYD 14 2 2565 160 YETTER DECAL...

Page 23: ...EL HUB 11L 15 ASS Y 6 1 2515 345 3 3 4 X 20 TIE ROD REP CYL BLACK 7 4 2520 357 13 LOCK HEX NUT ZYD 8 4 2502 313 13 X 3 HHCS GR 5 ZYD 9 1 6300 101 TOP LINK ASSEMBLY 10 1 1000 121 UPPER HITCH PIN ASS Y...

Page 24: ...3 8 X 150 W 6 JIC F ENDS 15 2 2515 327 ADAPTER SAE TO 6 JIC 16 46 2520 515 10 LOCK HEX NUT ZYD 17 2 6300 208 TRANSPORT LOCK W A 18 1 6300 210 TOOLBAR HANGER W A 19 23 2570 643 10 X 5 X 6 U BOLT ZYD 20...

Page 25: ...25 PARTS IDENTIFICATION...

Page 26: ...26 PARTS IDENTIFICATION...

Page 27: ...27 PARTS IDENTIFICATION...

Page 28: ...1 EA 8 13 16 4 EA OF 14 8 2 6300 214 GAUGE WHEEL JACK W A 9 2 6600 160 HUB SUB ASSEMBLY INCLUDES 1 EA OF 10 17 18 10 4 2550 053 1 1 16 BEARING L44649 11 2 2570 197 WASHER WILTON 9136081 12 2 2531 106...

Page 29: ...29 PARTS IDENTIFICATION...

Page 30: ...30 PARTS IDENTIFICATION...

Page 31: ...ditions varying from soft to hard as you travel through the field When adjusting active hydraulic down pressure it is important to remember the following Seed depth is largely controlled by coulter de...

Page 32: ...VIEW Hydraulic Cycle Time Rear Lift Cylinders Tractor at 1500 RPM Hydraulic Outlets set at fast Rabbit Full Cycle Time is 4 5 seconds up 4 5 seconds down SIDE VIEW 12 500 LB Lift Capacity Includes Ca...

Page 33: ...ed choose the appropriate length of bolt for toolbar size 4 Attach wiring harness to lights 5 Use cable ties to strap wiring harness to toolbar at regular intervals KEY QTY PART NO DESCRIPTION 1 6 251...

Page 34: ...pressure Alignment METHOD Adjust top link to make top of seed box parallel to ground in operating position Lower drill to firm ground to leave mark on surface drive forward 20 feet Check to see that o...

Page 35: ...ulter down pressure Spring down pressure Solution Check to see if hydraulic hoses are fully engaged in tractor hydraulic outlets Check to see if transport hydraulic locks are removed On tractors with...

Page 36: ...36 2565 330_REV_C 07 18...

Reviews: