Transportation
3
-
15
3.1.1
Using a crane
Adequate load handling devices must be used to transport the robot. Make sure that the
robot is lifted as shown in the diagram "Transport by crane".
Transport with crane
8 screws M12 x 25
Shipping bracket
Position of the center
of gravity
Wire rope (at least
2000 mm long)
1
2
3
4