1.
For the project engineering of connections, open the connection list by selecting the
according CPU. Choose
Insert new connection
in the context menu:
n
Connection partner (partner station)
A dialog window opens where you may choose the connection partner and the
connection type
.
n
Specified connection partner
Each station configured in the Siemens SIMATIC Manager is listed in the table
of connection partner. These stations are unique specified by an IP address and
a subnet mask.
n
Unspecified connection partner
Here the connection partner may exist in the
current project
or in an unknown
project. Connection jobs to an
unknown project
must be defined by an unique
connection name, which is to be used in the projects of both stations. Due to
this allocation the connection remains
unspecified.
2.
Choose the connection partner and the type of connection and confirm with [OK].
ð
If activated, a properties dialog for the according connection opens as link to
your PLC user program.
3.
After every connection was configured by this way, you may save and compile your
project and exit NetPro.
Projecting connections
Projecting connections
VIPA System MICRO
Deployment PG/OP communication - productive
Configure Siemens S7 connections
HB400 | CPU | M13-CCF0000 | en | 16-47
149