Checklist commissioning, parameterization and validation
Checklist
Run.
No.
Requirement
fulfilled
Notes
3
Commissioning
yes
no
3.1
Is guaranteed that all safe communication participants
of a system have a clear safe device address (F-
address)?
This is valid also for participants, which belong to dif-
ferent safety controllers, if the controllers are connected
by gateways (e.g. Ethernet).
3.2
Is the station number of the safety PLC correctly
adjusted?
3.3
Were the device parameters of the System SLIO safety
modules validated?
3.4
Was the safety cycle time determined and adjusted in
the safety PLC?
3.5
Was the maximum response time with the adjusted
cycle time proofed by calculation?
3.6
Were the project data copied on a memory card?
3.7
Was a complete functional test accomplished and docu-
mented?
3.8
Was the service personnel instructed into the handling
of the control system?
Date:.........................Name: ...................................Sign: ......................................................