30
YASKAWA
TOEPC71061782C GA800 Drive Installation & Primary Operation
1.
Put the end of a prepared wire into the terminal block.
Figure 7.6 Install the Electrical Wire
2.
Tighten the screws to the specified torque.
Figure 7.7 Tighten Terminal Block Screws
3.
Install the front cover and the keypad to their initial positions.
■
Wire the Main Circuit Terminal Block with Procedure B
Notes on Wiring the Main Circuit Terminal Block
Note:
•
After the wiring, do not twist or shake the electrical wires too much.
•
Be sure to use only wires with the correct size, stripped wire length, and tightening torque as specified by Yaskawa.
•
Use tools that fit the shape of the screw head to tighten and loosen the terminal block screws.
•
Make sure that there are no loose stranded wires or frayed wires after wiring is complete.
Main Circuit Terminal Block Wiring Procedure
Remove the terminal cover before you wire the main circuit terminal block.
1.
Remove the terminal block nut.
A - Nut
Figure 7.8 Remove the Terminal Block Nut