4.3 Wiring the Power Supply to the SERVOPACK
4.3.3 Power ON Sequence
4-13
4
W
iring and Connecting
S
ER
VOP
ACK
s
1.
Remove the main circuit connector and motor connector from the SERVOPACK.
2.
Remove the sheath from the wire to connect.
3.
Open the wire insertion hole on the terminal connector with the tool. There are the fol-
lowing two ways to open the insertion hole. Use either method.
4.
Insert the conductor into the wire insertion hole. Then, remove the Spring Opener or flat-
blade screwdriver.
5.
Make all other connections in the same way.
6.
When you have completed wiring, attach the connectors to the SERVOPACK.
4.3.3
Power ON Sequence
Consider the following points when you design the power ON sequence.
•
The ALM (Servo Alarm) signal is output for up to five seconds when the control power supply
is turned ON. Take this into consideration when you design the power ON sequence, and
turn ON the main circuit power supply to the SERVOPACK when the ALM signal is OFF (alarm
cleared).
Using a Spring Opener
Using a Flat-blade Screwdriver
Open the insertion hole with the Spring Opener as
shown in the figure.
Firmly insert a flat-blade screwdriver into the
screwdriver insertion hole to open the wire inser-
tion hole.
S
ervomotor connector
Main circuit
connector
Enlarged View
Lock
s
2. Pre
ss
in on the
lock
s
to remove
the connector
s
.
1. Pre
ss
in on
the lock.
S_Analog
8 mm to 9 mm
Wire
S
pring Opener