background image

72

You have fi nished shingling your roof. Proceed to capping the ridge.

FINISH

Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as 

shown below. If shingles overlap at ridge cut to peak with a utility knife.

Repeat steps 1 - 5  to shingle the opposite side of your roof. Trim shingles at ridge.

Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.

Using your shingle hooked blade carefully cut shingles along chalk line.

5

6

7

8

SHINGLES

continued...

 

• If more than 5" to rain slot you must install another row of shingles.

   5"

(12,7 cm)

or less.

   5"

(12,7 cm) MAX. 

Top of rain slot.

Cut Off.

CUT

Summary of Contents for FAIRFIELD GABLE 10 x 10

Page 1: ...embly or product information call our toll free number 1 800 844 9273 or email customerservice yardline net Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Sa...

Page 2: ...This page intentionally left blank...

Page 3: ...ervice Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level...

Page 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...or paint WOOD GLUE Exterior Rated REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT This floor has been designed for general use Depending on your specific use you may want to construct a heavy duty floo...

Page 6: ...5 1 4 5 1 x 10 2 x 191 1 cm ECN x2 3 8 x 5 7 8 x 45 3 8 1 x 14 9 x 115 3 cm 19 32 x 3 x 72 1 5 x 7 6 x 183 cm x1 ZJ 1 x 3 x 72 1 6 x 7 6 x 182 9 cm x1 HJ x4 19 32 x 3 x 26 5 8 1 5 x 7 6 x 67 6 cm AH x...

Page 7: ...12 1 2 1 x 20 3 x 31 8 cm x6 x3 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x6 1 x 4 x 96 2 5 x 10 2 x 243 8 cm x1 KP WALL PANEL DOORS PARTS LIST x6 3 8 x 48 x 76 1 x 121...

Page 8: ...60 6 cm x1 Treated lumber is stamped x9 2 x 4 x 17 1 2 5 x 10 x 44 5 cm TREATED x2 2 x 4 x 48 5 x 10 x 122 cm TREATED x2 2 x 4 x 72 5 x 10 x 183 cm TREATED 2 x 4 x 93 5 x 10 x 236 2 cm x9 TREATED 2 x...

Page 9: ...est results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE Leveling higher th...

Page 10: ...l sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs...

Page 11: ...x1 2 x 4 x 96 5 x 10 x 244 cm TREATED x1 2 x 4 x 48 5 x 10 x 122 cm TREATED x1 2 x 4 x 24 5 x 10 x 61 cm TREATED x9 2 x 4 x 17 1 2 5 x 10 x 44 5 cm TREATED BEGIN You will build two floor sections HINT...

Page 12: ...236 2 cm TREATED x1 2 x 4 x 96 5 x 10 x 244 cm TREATED x1 2 x 4 x 48 5 x 10 x 122 cm TREATED x1 2 x 4 x 24 5 x 10 x 61 cm TREATED HINT For easier nailing stand on frame 48 72 8 40 56 72 88 104 24 96 1...

Page 13: ...IRED Flush Flush FLOOR FRAME x60 Attach floor sections together as shown using 3 nails 3 You have finished your floor frame Proceed to level and square frame FINISH 120 305 cm 116 1 2 295 9 cm 4 Nails...

Page 14: ...proximately 167 1 4 424 8 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the f...

Page 15: ...rement will be approximately 167 5 16 425 cm Attach the 48 x 96 panel with the 48 edge and corner flush to the outside of the floor frame Fig A and 3 4 along the floor joist Use the GAA gauge block fo...

Page 16: ...ling the remaining panels in the following order 1 48 x 96 2 20 1 2 x 96 3 23 7 8 x 96 4 20 1 2 x 23 7 8 Maintain 3 4 measurement along edge of panel using the 3 4 Gauge Block Secure panels using 2 na...

Page 17: ...the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure durin...

Page 18: ...4 x 4 7 8 5 1 x 10 2 x 12 4 cm BEGIN 1 Secure one CLA flush to the floor deck using two 3 screws Measure over 120 3 4 and install a second CLA Secure using two 3 screws 120 3 4 306 7 cm Fig A You wil...

Page 19: ...using glue and 12 2 nails No need to use jig for 2nd gusset 3 2 BEGIN 1 1 5 8 4 1 cm Screw 120 3 4 306 7 cm Place two rafters ECN into the jig as shown Keep ECN firm against outside CLA s as shown Fig...

Page 20: ...9 cm GAP 1 4 1 9 cm GAP ECN x2 ECN x2 Fig A Fig B Fig C Glue where gusset installs Keep rafters firmly against CLA at both ends when securing gusset You have finished assembling your rafters Gable end...

Page 21: ...m AM x1 7 16 x 3 x 67 1 1 x 7 6 x 170 2 cm OSB Glue both sides Build Door Header with OSB in the middle use 3 Nails Glue both sides of OSB 1 BEGIN You have assembled your door header FINISH 1 OSB ASSE...

Page 22: ...62 2 cm 24 1 2 62 2 cm x1 Pre Assembled Header Pre Assembled Header BEGIN 1 Orient parts on edge on floor Measure and mark Use two 3 nails at each mark x2 2 x 4 x 24 1 2 5 1 x 10 2 x 62 2 cm KHA 104 1...

Page 23: ...frame flush to top as shown Secure panels with 2 nails 6 apart 2 Install all panels with primed side up 48 x 76 121 9 x 193 cm x1 LEFT x1 RIGHT Maintain Flush Maintain Flush Flush 6 15 2 cm For squar...

Page 24: ...Attach temporary support HJ to frame as shown using 3 screws 4 3 You have finished building your front wall FINISH Maintain Flush HJ Flush Flush Maintain Flush Primed side up Primed side up 6 15 2 cm...

Page 25: ...cm 44 1 2 113 cm 92 1 2 235 cm 68 1 2 174 cm 68 1 2 174 cm 68 1 2 174 cm 20 1 2 52 1 cm 1 1 2 3 8 cm 113 287 cm x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x2 2 x 4 x 44 1 2 5 1 x 10 2 x 113 cm STL TOE...

Page 26: ...D x122 2 5 1 cm 48 x 76 121 9 x 193 cm x2 3 4 GAUGE BLOCK You have finished building your back wall FINISH Carefully flip the back wall over 3 4 GAUGE BLOCK BEGIN HERE For squareness maintain flush an...

Page 27: ...TM 25 LEFT WALL 3 7 6 cm Nails TOENAILING DOOR TM x6 TJ CPB TP RL 1 1 2 3 8 cm HINT For easier nailing stand on frame BEGIN 1 Orient parts on edge on floor Measure and mark Use two 3 nails at each ma...

Page 28: ...26 LEFT WALL 48 x 76 121 9 x 193 cm x2 12 30 5 cm 12 30 5 cm 3 4 GAUGE BLOCK You have finished building your left wall FINISH Carefully flip the left wall over BEGIN HERE For squareness maintain flush...

Page 29: ...TM 27 RIGHT WALL 3 7 6 cm Nails TOENAILING DOOR TM x6 TJ CPB TP RL 1 1 2 3 8 cm 72 182 9 cm HINT For easier nailing stand on frame BEGIN 1 Orient parts on edge on floor Measure and mark Use two 3 nail...

Page 30: ...HT WALL 12 30 5 cm 12 30 5 cm 48 x 76 121 9 x 193 cm x2 You have finished building your right wall FINISH Carefully flip the right wall over 3 4 GAUGE BLOCK 48 122 cm 48 122 cm 20 5 8 52 4 cm 6 15 2 c...

Page 31: ...ck wall bottom plates to floor using 3 nails Fig A 3 7 6 cm x10 x2 x30 BACK WALL INSTALLATION 3 7 6 cm Screws OO 3 Nails into bottom plate BEGIN Center back wall assembly on the 120 304 8 cm floor dim...

Page 32: ...FRAMES ARE FLUSH 2 Nail lower edge of left wall panels to floor using 2 nails 6 apart Angle nail to hit floor frame Fig B ENSURE LEFT AND BACK WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2 cm Flush Fig...

Page 33: ...r left wall FINISH Secure left wall to floor using 3 nails Fig C Nail back wall panel to left wall stud using 1 1 2 nails 6 apart Fig C 3 Secure back wall top frame 2 x 4 using 3 screw toe screwed int...

Page 34: ...ION PARTS REQUIRED 2 5 1 cm x2 2 5 1 cm x23 BEGIN Flush 2 5 1 cm Screw 2 5 1 cm Screw Fig A 2 5 1 cm Screw Flush ENSURE RIGHT AND BACK WALL PANEL ARE FLUSH BEFORE SECURING 20 5 8 x 76 PANEL GOES TO TH...

Page 35: ...installing your right wall Secure bottom plate to floor using 3 nails Fig C Nail back wall panel to right wall stud using 1 1 2 nails 6 apart Fig C FINISH 3 1 1 2 3 8 cm Nails Fig D 3 7 6 cm Screw Fig...

Page 36: ...ALL INSTALLATION 2 5 1 cm x4 x24 1 1 2 3 8 cm Fig A Flush Panel Flush 2 7 6 cm Screw 2 7 6 cm Screw 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush D O O R BEGIN Center front wall assembly on the floor 1 Na...

Page 37: ...ail to hit floor frame Fig B 4 Secure front wall bottom plates to floor using 3 nails Fig B Secure front wall top plate using one 3 screw toe screwed into left and right top plates at an angle as show...

Page 38: ...GIN 1 24 61 cm 24 61 cm 24 61 cm 21 53 3 cm 24 3 8 61 9 cm Align over studs Fig A Fig B Tight to side wall 3 3 7 6 cm Screws Flush to outside of panel Secure rafters to top plate with two 3 screws abo...

Page 39: ...mporary supports OO and GAA as shown Tighten securely OO GAA OFFSET 4 3 7 6 cm Screws 1 1 4 3 cm Screws 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm x4 Bottom edges Flush 1 x 3 x 5 2...

Page 40: ...2 3 3 7 6 cm Screws into door trim 3 7 6 cm Screw 3 7 6 cm x13 OO Flush against wall panels Fig A OO Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using th...

Page 41: ...d securing your door and trim FINISH 2 Attach GPL and GPR first then lower horizontal door rails with 3 4 screws 3 Center trim ZJ over doors and secure using five 2 finish nails 4 Install metal thresh...

Page 42: ...t and right doors as shown Fig A B Secure using 7 2 screws through outside trim into OO Fig B 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH Fig A Center OO in door opening OO x2 1 1 2 x 2 1 2 x...

Page 43: ...ocation of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 You h...

Page 44: ...42 DOOR HARDWARE PARTS REQUIRED RIGHT DOOR Set Screw 1 1 4 Wood Screw Pre drill for screws Secure handle with 1 1 4 screws as shown x1 1 1 4 x2 Handle locking with Screws...

Page 45: ...on flat Measure distance from over door trim to top plate Fig A Orient BJC on flat as shown Transfer the measurement from Fig A onto the left front gable panel Place left front gable panel at measurem...

Page 46: ...e panel flush to installed center panel Ensure panels are flush Secure panel to BJC using 1 1 2 nails You have finished assembling your front gable unit FINISH Flush Flush Maintain Flush 1 3 4 4 5 cm...

Page 47: ...finished attaching your front gable FINISH Working inside secure gable unit with 3 screws toe screwed into BJC at an angle as shown in Fig B 2 5 1 cm x41 Center front gable unit on front wall top plat...

Page 48: ...shown Place left front gable panel as shown and secure using 1 1 2 nails 1 BEGIN 2 3 Place second BJC as shown under center panel as shown Ensure panels are flush Secure panel to installed BJC using 1...

Page 49: ...Fig A Fig B TOP PLATE 6 15 2 cm SPACED EVENLY 2 5 1 cm Nails BEGIN 1 2 You have finished attaching your front gable Working inside secure gable unit with 3 screws toe screwed into BJC at an angle as...

Page 50: ...ark locations of four CLA as shown place ECA on top Secure using 3 screws as shown Fig A Ensure parts are flush along edges 2 3 4 1 BEGIN x4 2 x 3 x 75 1 4 5 1 x 7 6 x 191 1 cm ECA x8 2 x 4 x 4 7 8 5...

Page 51: ...assembly Attach roof panels using 2 nails 6 apart Note panel over hangs ladder 3 4 1 9 cm along edge Fig D 7 16 x 8 5 8 x 27 1 4 1 1 x 21 9 x 69 2 cm 7 16 x 8 5 8 x 48 1 1 x 21 9 x 121 9 cm 3 4 1 9 cm...

Page 52: ...unit Ensure gable unit is ush against installed gable unit at the top Secure right and left gable unit s framing to rafter using 3 screws as shown Fig C 2 1 BEGIN Place the left gable unit onto rafte...

Page 53: ...ds Fig A Secure panel with two 2 nails in the corners 2 Attach a 20 5 8 x 27 1 4 roof panel flush to the installed panel and flush to the rafter bottom ends Fig A Secure panel with two 2 nails in the...

Page 54: ...of the rafters 20 1 4 51 4 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm Fig B 2 Nails 3 4 1 9 cm Gauge Block Fig C 27 1 4 x 48 Flush Flush 4 Attach a 27 1 4 x 48 roof panel with a 3 4 measurement on the ra...

Page 55: ...ecure panel with two 2 nails in the corners 3 4 1 9 cm Gauge Block Fig C 7 16 x 27 1 4 x 48 1 1 x 69 2 x 121 9 cm x1 7 16 x 20 5 8 x 48 1 1 x 55 6 x 121 9 cm x1 27 1 4 x 48 Flush Flush Two Nails Flush...

Page 56: ...12 30 5 cm You have finished installing your roof panels 9 FINISH Repeat STEPS 1 8 to attach roof panels on the opposite side 7 Secure top of each lower panel using one 2 nail into each rafter as sho...

Page 57: ...flush at peak Fig C Secure panels with 2 finish nails x2 3 8 x 7 7 8 x 73 5 16 1 x 20 x 186 2 cm x40 2 5 1 cm 1 BEGIN You have finished installing your soffit panels FINISH Ensure soffit panels are f...

Page 58: ...8 2 finish nails two in each rafter Ensure soffit panels are flush at rafter ends Fig B and flush at seam x28 2 5 1 cm 1 BEGIN You have finished installing your eave side soffit panels FINISH x2 3 8 x...

Page 59: ...ecure using 2 finish nails into rafter ends You have finished installing your eave side fascia FINISH 1 BEGIN Ensure fascia panels are flush at seam Fig B DOOR PARTS REQUIRED Primed Side Out 2 5 1 cm...

Page 60: ...hout 3 1 4 x 5 7 8 shim 3 You have installed your gable trim FINISH 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm Primed Side Out Fig C...

Page 61: ...ils You have attached your corner trim 73 7 8 187 6 cm on eave walls 74 1 2 189 2 cm on gable wall Fig B Fig A Flush under gable panel 74 1 2 189 2 cm Seam is flush Caulk seam before painting trim 73...

Page 62: ...ft side Secure shelf supports at shown height with three 2 5 1 cm nails 1 BEGIN 2 x18 2 5 1 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x6 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x6 PARTS REQUIRED AE x5 x1 2...

Page 63: ...s at each support as shown 3 FINISH You have finished installing your shelf 4 7 16 x 11 7 8 x 23 7 8 1 1 x 30 2 x 60 6 cm x1 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 1 x 4 x 23 7 8 2 5 x 10 2 x 60...

Page 64: ...lue across RL and TP as shown Fig A Hold parts TP and RL flush and aligned 1 3 4 4 4 cm 1 3 4 4 4 cm Glue RL TP TP Flush Flush Flush 3 7 6 cm Nails x12 RL 2 3 5 Assemble joist with 3 nails in a stagge...

Page 65: ...5 1 x 10 2 x 304 8 cm x1 Pre Assembled Loft Joist 7 8 Clamp or hold Pre Assembled Loft Joist in place flush under top plate Drill through joist and wall studs with 7 16 drill bit as shown Secure joist...

Page 66: ...oad not to exceed 400 lbs 181 kg evenly distributed across loft FINISH You have finished installing your loft 8 20 3cm 2 5 1 cm Nails Flush Flush 9 Install loft panel centered over loft joists Secure...

Page 67: ...IN Position and level collar tie on 3rd rafter from back HINT For best appearance install collar tie on rafter facing away from door opening Attach with 2 nails as shown You have finished installing y...

Page 68: ...ttach window using 8 3 4 screws as shown Fig A 3 4 1 9 cm Screws HINT Caulk behind frame near edge before installing Fig A Seal window behind flange edges with high quality exterior grade caulk before...

Page 69: ...and install window trim over transom window using 2 finish nails x2 19 32 x 2 1 2 x 32 3 4 1 5 x 6 3 x 83 1 cm YR 2 Finish Nails x2 19 32 x 2 1 2 x 9 1 5 x 6 3 x 22 8 cm EY YR Mark Center Center of W...

Page 70: ...walls for vent locations Measure and mark vent hole in wall as shown Cut out marked opening Caulk behind vent flanges Secure using 1 2 1 3 cm screws You have finished installing your wall vent x12 1...

Page 71: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 72: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 73: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 74: ...ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 75: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 76: ...4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 77: ...This page intentionally left blank...

Page 78: ...olas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola...

Reviews: