1
Secure back wall to left wall using one 2" screw into left wall top and bottom plates
(Fig. A)
.
30
LEFT WALL INSTALLATION
2" (5,1 cm)
x23
2" (5,1 cm)
x2
PARTS REQUIRED:
ENSURE TOP OF WALL FRAMES ARE FLUSH.
2
Nail lower edge of left wall panels to fl oor using 2" nails 6" apart. Angle nail to hit fl oor frame
(Fig. B)
.
ENSURE LEFT AND BACK WALL PANELS ARE FLUSH BEFORE SECURING.
6"
(15,2 cm)
Flush
Fig. A
Fig. B
2" (5,1 cm)
Nail
Angle nail to hit
fl oor frame.
BEGIN
2" (3,8 cm)
Screw
2"
(5,1 cm)
Screw
Flush
2" (5,1 cm) Nails
2"
(5,1 cm)
Screw
Flush
20-5/8 x 76" PANEL
GOES TO THE BACK
OF THE SHED