![Yanmar SV26 User Operation And Maintenance Manual Download Page 156](http://html.mh-extra.com/html/yanmar/sv26/sv26_user-operation-and-maintenance-manual_905634156.webp)
5 L
IST OF PERIODIC INSPECTIONS AND MAINTENANCE
OPERATIONS
•
The table below indicates the maintenance intervals to be respected for optimum operation of
the machine. Read the machine's time counter every day to check whether a procedure should be
implemented.
•
The inspection sheets provided at the end of this manual enable you to keep a trace of the
maintenance operations carried out.
IMPORTANT
These are frequencies : for examplen the operations to be carried out every 50 hours must
be carried out at 50h, 100h, 150h, 200h, etc.
•
Certain intervals may vary if a hydraulic hammer is used. Refer to the corresponding notes.
1
2
X:
Y:
Note
•
If a hydraulic hammer is used, the re-
turn filter must be replaced after 100 or
150 hours of service for a new machine,
then according to the diagram opposite.
•
The hydraulic oil must be replaced
more frequently if a hydraulic hammer is
used. Comply with the diagram opposite.
1 = Hydraulic oil
2 = Hydraulic oil return filter
X = Hydraulic hammer usage rate (%)
Y = Replacement interval (h)
139
Summary of Contents for SV26
Page 3: ......
Page 5: ......
Page 7: ......
Page 9: ......
Page 17: ......
Page 19: ...2 ...
Page 24: ...3 Warning labels 7 3 1 Location of the warning adhesive labels ...
Page 25: ...3 Warning labels 8 ...
Page 75: ...58 ...
Page 115: ...9 Rubber tracks 98 9 6 Track replacement 6 4 2 Track replacement page 149 ...
Page 145: ...128 ...
Page 175: ...158 ...
Page 179: ...162 ...
Page 181: ...164 ...
Page 187: ...170 ...
Page 200: ...C Notes 183 ...
Page 204: ...MINI EXCAVATOR http www yanmar eu ...
Page 205: ...MINI EXCAVATOR SV26 USER OPERATION AND MAINTENANCE MANUAL ...