Trench - 124
RT70 Operator’s Manual
Set Up
Set Up
1. If using optional trench cleaner, remove bolt installed for transport (shown).
2. Fasten and adjust seat belt.
3. Start machine.
4. Drive to starting point. Move in line with planned trench.
5. Set parking brake.
6. Select low ground drive speed.
7. Lower boom to just above ground.
8. Check that attachment speed/direction and ground drive controls are in neutral.
9. Lower backfill blade, if equipped, to reduce shock when trenching begins.
IMPORTANT:
• When cutting asphalt, start trench in soil
at edge of road and use shortest possible
boom at full depth.
• Sight along center of hood to a stake
driven beyond end of trench line for
straight trench.
• For optimal spoils delivery, adjust the
auger positions forward or backward to
accommodate terrain and digging depth.
t33om080w.eps
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...