
15
2. PRE-OPERATION PROCEDURES
Installation
13. Install the reverse osmosis (RO) membrane.
●
T
urn power off and close water tap before installing or replacing the reverse osmosis
(RO) membrane.
●
WE200 unit is shipped with an RO membrane installed. Review the following when
replacing.
●
Install procedure:
(1) Place RO membrane into designated
brackets as shown in Figure 7.
(2) Push tube marked,
“RO IN” evenly
into the upper coupler on RO
membrane.
(3) Push tube marked,
“RO Left” evenly
into lower left coupler on RO
membrane.
(4) Push tube marked,
“RO Right” evenly
into lower right coupler on RO
membrane.
●
Removal procedure:
(1) Tubes are easily removed from
couplers, simply by pushing the
coupler collet in and pulling tube out.
(See Figure 9.)
※
Tubes are more easily removed by
pushing entire collet in, rather than
only a portion of it.
Figure 7
Figure 08
Figure 09
※
Once all three tubes have been connected, give each a gentle tug to verify that they are
connected securely.
※
When removing tubes, water may drip from RO membrane couplers. Be careful not to let water
get on the leak sensor.
Collet
Pull
RO IN
Upper coupler
Lower right
coupler
Lower left coupler
RO
Right
RO
Left
Brackets
Summary of Contents for Pure Line WE200
Page 50: ...48 11 WIRING DIAGRAM ...