REAR WHEEL
4-7
EAM20096
REAR WHEEL
Removing the rear wheel
Order
Job/Parts to remove
Q’ty
Remarks
Use a maintenance stand to raise the rear
wheel off the ground.
1
Rear wheel axle nut
1
2
Rear wheel axle
1
3
Drive chain puller
2
4
Rear wheel
1
5
Collar
2
6
Rear wheel sprocket
1
7
Oil seal
2
8
Circlip
1
9
Bearing
2
10
Brake disc
1
2
5
7
(6)
4
6
1
(6)
3
8
9
10
5
3
19 N
・
m (1.9 k
g
f
・
m, 14 lb
・
ft)
19 N
・
m (1.9 k
g
f
・
m, 14 lb
・
ft)
125 N
・
m (12.5 k
g
f
・
m, 92 lb
・
ft)
42 N
・
m (4.2 k
g
f
・
m,
3
1 lb
・
ft)
12 N
・
m (1.2 k
g
f
・
m,
8
.9 lb
・
ft)
9
(6)
7
Summary of Contents for YZ250 2022
Page 5: ...EAM20162 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 8: ......
Page 10: ......
Page 38: ...MOTORCYCLE CARE AND STORAGE 1 26...
Page 54: ...CABLE ROUTING DIAGRAM 2 15 EAM20152 CABLE ROUTING DIAGRAM Frame and engine left side view...
Page 56: ...CABLE ROUTING DIAGRAM 2 17 Frame and engine left side view...
Page 58: ...CABLE ROUTING DIAGRAM 2 19 Frame and engine right side view...
Page 60: ...CABLE ROUTING DIAGRAM 2 21 Handlebar front view 0 mm 0 in 0 mm 0 in...
Page 62: ...CABLE ROUTING DIAGRAM 2 23 Rear brake right side view...
Page 64: ...CABLE ROUTING DIAGRAM 2 25...
Page 92: ...ELECTRICAL SYSTEM 3 26...
Page 160: ...CHAIN DRIVE 4 66...
Page 193: ...CLUTCH 5 31 2 1...
Page 233: ...ELECTRICAL COMPONENTS 8 6 EAM30289 CHECKING THE SWITCHES 1 1 Engine stop switch...
Page 254: ...TROUBLESHOOTING 9 13...
Page 261: ...ENGINE 10 6...
Page 274: ......