ELECTRICAL SPECIFICATIONS
2-9
EASB29B056
ELECTRICAL SPECIFICATIONS
Voltage
System voltage
12 V
Ignition system
Ignition system
TCI
Advancer type
Digital
Ignition timing (B.T.D.C.)
10.0 °/2000 r/min
Engine control unit
Model
B292
Ignition coil
Primary coil resistance
2.16–2.64
Secondary coil resistance
8.64–12.96 k
Spark plug cap
Resistance
7.50–12.50 k
Lean angle sensor output voltage
Operating angle
45 °
Output voltage up to operating angle
0.4–1.4 V
Output voltage over operating angle
3.7–4.4 V
Charging system
Charging system
AC magneto
Standard output
14.0 V, 160 W at 5000 r/min
Stator coil resistance
0.528–0.792
Rectifier/regulator
Regulator type
Three-phase
Regulated voltage (DC)
14.1–14.9 V
Rectifier capacity (DC)
23.0 A
Battery
Model
YTZ7S(F)
Voltage, capacity
12 V, 6.0 Ah (10 HR)
Indicator light
Fuel level warning light
12 V, 1.7 W
Engine trouble warning light
12 V, 1.7 W
Starter motor
Power output
0.35 kW
Armature coil resistance
0.0189–0.0231
Brush overall length
7.0 mm (0.28 in)
Limit
3.50 mm (0.14 in)
Brush spring force
3.92–5.88 N (400–600 gf, 14.11–21.17 oz)
Commutator diameter
17.6 mm (0.69 in)
Limit
16.6 mm (0.65 in)
Mica undercut (depth)
1.50 mm (0.06 in)
Fuel injection sensor
Crankshaft position sensor resistance
228–342
Intake air temperature sensor resistance
5400–6600
at 0 °C (5400–6600
at 32 °F)
Intake air temperature sensor resistance
290–389
at 80 °C (290–389
at 176 °F)
Coolant temperature sensor resistance
2512–2777
at 20 °C (2512–2777
at 68 °F)
Coolant temperature sensor resistance
210–220
at 100 °C (210–220
at 212 °F)
Summary of Contents for YZ 2018 Series
Page 6: ...EASB916006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 40: ...MOTORCYCLE CARE AND STORAGE 1 28...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 70: ...CABLE ROUTING DIAGRAM 2 29 EASB29B065 CABLE ROUTING DIAGRAM...
Page 72: ...CABLE ROUTING DIAGRAM 2 31...
Page 74: ...CABLE ROUTING DIAGRAM 2 33...
Page 76: ...CABLE ROUTING DIAGRAM 2 35...
Page 78: ...CABLE ROUTING DIAGRAM 2 37...
Page 80: ...CABLE ROUTING DIAGRAM 2 39...
Page 82: ...CABLE ROUTING DIAGRAM 2 41...
Page 84: ...CABLE ROUTING DIAGRAM 2 43...
Page 255: ...OIL PUMP AND BALANCER GEAR 5 58 a 2 10 b 2 9 1 b 5 3 a 4 10 5 9 3 E c d 6 7 8 8 b 6...
Page 276: ...TRANSMISSION 5 79...
Page 290: ...FUEL TANK 7 5 A Left B Right 1 1 A 0 mm 0 in B 1 1 15 mm 0 59 in...
Page 296: ...THROTTLE BODY 7 11...
Page 299: ......
Page 313: ...CHARGING SYSTEM 8 14...
Page 321: ...COOLING SYSTEM For JPN 8 22...
Page 351: ...FUEL PUMP SYSTEM 8 52 EASB29B345...
Page 352: ...ELECTRICAL COMPONENTS 8 53 ELECTRICAL COMPONENTS EASB29B346 9 10 11 1 3 2 4 5 6 7 8...
Page 354: ...ELECTRICAL COMPONENTS 8 55 11 10 9 2 3 1 6 7 8 4 5...
Page 356: ...ELECTRICAL COMPONENTS 8 57 EASB29B347 CHECKING THE SWITCHES 4 1 3 2 B B Sb B B B B B B B B...
Page 372: ...ELECTRICAL COMPONENTS 8 73 c Measure the fuel injector resistance...