ENGINE
3-7
4. Install:
• Vacuum gauge “1”
• Digital tachometer
5. Install:
• Fuel tank
Refer to “FUEL TANK” on page 7-1.
6. Adjust:
• Throttle body synchronization
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Measure the vacuum pressure of the front
cylinder throttle body and rear cylinder throt-
tle body.
b. Using the throttle body with the lowest vacu-
um pressure as the standard, turn the air
screw “1” of the other throttle body to adjust
its vacuum pressure.
c. If the vacuum pressure of the throttle body
with the lower pressure is out of specification,
adjust it to specification first, and then syn-
chronize the throttle bodies.
NOTE:
• After each step, rev the engine two or three
times, each time for less than a second, and
check the synchronization again.
• If the air screw is removed, turn the screw 3/4
turn in and be sure to synchronize the throttle
body.
CAUTION:
ECA14900
Do not use the throttle valve adjusting
screws to adjust the throttle body synchroni-
zation.
Vacuum gauge
90890-03094
Carburetor synchronizer
YU-44456
1
A. Front cylinder throttle body
B. Rear cylinder throttle body
Vacuum gauge
90890-03094
Carburetor synchronizer
YU-44456
1
A
1
B
1
1
A
B
Summary of Contents for XVS13AW
Page 2: ...SERVICE MANUAL XVS13AW C XVS13CTW C LIT 11616 20 42 3D8 28197 10 ...
Page 7: ......
Page 9: ......
Page 25: ...SPECIAL TOOLS 1 15 ...
Page 52: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 26 ...
Page 55: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 EAS20410 LUBRICATION DIAGRAMS A A 1 2 2 3 A A ...
Page 57: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 1 2 3 ...
Page 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 32 1 Camshaft 2 Oil nozzle 3 Crankshaft ...
Page 59: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Oil delivery pipe 1 2 Timing chain tensioner ...
Page 61: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 2 3 4 5 6 ...
Page 63: ...COOLING SYSTEM DIAGRAMS 2 37 EAS20420 COOLING SYSTEM DIAGRAMS A A A A 2 1 4 3 5 6 ...
Page 65: ...COOLING SYSTEM DIAGRAMS 2 39 A B B A 4 3 3 1 2 2 A A B B ...
Page 83: ...CABLE ROUTING 2 57 3D8 3D8 A B B A A B C D E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ...
Page 85: ...CABLE ROUTING 2 59 ...
Page 89: ...CABLE ROUTING 2 63 ...
Page 92: ......
Page 125: ...ELECTRICAL SYSTEM 3 33 ...
Page 128: ......
Page 203: ...BELT DRIVE 4 75 ...
Page 305: ...WATER PUMP 6 11 ...
Page 319: ...THROTTLE BODIES 7 13 ...
Page 322: ......
Page 328: ...IGNITION SYSTEM 8 6 ...
Page 336: ...CHARGING SYSTEM 8 14 1 AC magneto 2 Rectifier regulator 3 Main fuse 6 Battery ...
Page 338: ...CHARGING SYSTEM 8 16 ...
Page 352: ...COOLING SYSTEM 8 30 ...
Page 389: ...ELECTRICAL COMPONENTS 8 67 EAS27970 ELECTRICAL COMPONENTS 1 4 5 6 7 8 9 10 11 12 13 2 3 ...
Page 391: ...ELECTRICAL COMPONENTS 8 69 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ...
Page 413: ...ELECTRICAL COMPONENTS 8 91 ...
Page 421: ......
Page 422: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...