4 - 75
ENG
TRANSMISSION, SHIFT CAM AND SHIFT FORK
TRANSMISSION, SHIFT CAM AND SHIFT FORK
Extent of removal:
1
Shift cam and shift fork removal
2
Main axle and drive axle removal
Extent of removal
Order
Part name
Q’ty
Remarks
TRANSMISSION, SHIFTCAM
AND SHIFT FORK REMOVAL
Preparation for removal
Engine
Refer to “ENGINE REMOVAL” section.
Separate the crankcase.
Refer to “CRANKCASE, CRANKSHAFT
AND BALANCER” section.
1
Shift fork guide bar 1 (short)
1
2
Shift fork guide bar 2 (long)
1
3
Shift cam
1
4
Shift fork 2 (C)
1
5
Shift fork 3 (R)
1
6
Shift fork 1 (L)
1
7
Main axle
1
Refer to “REMOVAL POINTS”.
8
Drive axle
1
9
Push rod 2
1
10
Washer
1
1
2
Summary of Contents for TT-R125E(R)
Page 47: ...GEN INFO MEMO...
Page 147: ...SPEC MEMO...
Page 169: ...INSP ADJ MEMO...
Page 236: ...3 37 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING...
Page 237: ...3 38 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING...
Page 541: ...ELEC MEMO...
Page 553: ...ELEC MEMO...
Page 573: ...ELEC MEMO...
Page 576: ......
Page 577: ......