CYLINDERS AND PISTONS
5-44
b. If out of specification, rebore or replace the
cylinder, and replace the piston and piston
rings as a set.
c. Measure the piston skirt diameter “D” “a” with
the micrometer.
d. If out of specification, replace the piston and
piston rings as a set.
e. Calculate the piston-to-cylinder clearance
with the following formula.
f. If out of specification, rebore or replace the
cylinder, and replace the piston and piston
rings as a set.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
EAS24430
CHECKING THE PISTON RINGS
The following procedure applies to all of the pis-
ton rings.
1. Measure:
• Piston ring side clearance
Out of specification
→
Replace the piston
and piston rings as a set.
TIP
Before measuring the piston ring side clearance,
eliminate any carbon deposits from the piston
ring grooves and piston rings.
2. Install:
• Piston ring
(into the cylinder)
TIP
Level the piston ring in the cylinder with the pis-
ton crown.
Piston
Diameter D
99.955–99.970 mm (3.9352–
3.9358 in)
b. 8 mm (0.31 in) from the bottom edge of the
piston
• Piston-to-cylinder clearance =
Cylinder bore “C” -
Piston skirt diameter “P”
Piston-to-cylinder clearance
0.030–0.055 mm (0.0012–0.0022
in)
Limit
0.15 mm (0.0059 in)
Piston ring
Top ring
Ring side clearance
0.030–0.080 mm (0.0012–
0.0032 in)
Limit
0.130 mm (0.0051 in)
2nd ring
Ring side clearance
0.030–0.070 mm (0.0012–
0.0028 in)
Limit
0.130 mm (0.0051 in)
Summary of Contents for Star XVS13AA(C) 2011
Page 1: ...2011 SERVICE MANUAL XVS13AA C XVS13CTA C XVS13CA C LIT 11616 24 48 3D8 28197 13 ...
Page 6: ......
Page 8: ......
Page 59: ...TIGHTENING TORQUES 2 32 2 1 ...
Page 63: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 36 ...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 EAS20410 LUBRICATION DIAGRAMS A A 1 2 2 3 A A ...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 1 2 ...
Page 69: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 42 1 Camshaft 2 Crankshaft ...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 43 1 2 ...
Page 71: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 44 1 Oil delivery pipe 1 2 Timing chain tensioner ...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 45 1 2 3 4 5 6 ...
Page 74: ...COOLING SYSTEM DIAGRAMS 2 47 EAS20420 COOLING SYSTEM DIAGRAMS A A A A 2 1 4 3 5 6 ...
Page 76: ...COOLING SYSTEM DIAGRAMS 2 49 A B B A 4 3 3 1 2 2 A A B B ...
Page 100: ...CABLE ROUTING for XVS13AA C XVS13CTA C 2 73 A D B C 1 2 3 4 5 6 7 8 9 A B 10 11 12 13 14 A B ...
Page 122: ...CABLE ROUTING for XVS13CA C 2 95 C B C B A B A A C B E D 5 6 1 2 3 4 1 2 3 7 5 6 C C ...
Page 126: ...CABLE ROUTING for XVS13CA C 2 99 E A B C D C C A B A B C C 1 1 5 3 2 4 ...
Page 128: ...CABLE ROUTING for XVS13CA C 2 101 A H G B C D E F 2 J I 1 5 2 3 4 A A 7 6 ...
Page 134: ...CABLE ROUTING for XVS13CA C 2 107 ...
Page 137: ......
Page 175: ......
Page 374: ...TRANSMISSION 5 95 ...
Page 388: ...WATER PUMP 6 13 ...
Page 407: ......
Page 415: ...IGNITION SYSTEM 8 8 ...
Page 425: ...CHARGING SYSTEM 8 18 1 AC magneto 2 Rectifier regulator 3 Main fuse 6 Battery ...
Page 427: ...CHARGING SYSTEM 8 20 ...
Page 445: ...SIGNALING SYSTEM 8 38 ...
Page 489: ...FUEL INJECTION SYSTEM 8 82 ...
Page 496: ...ELECTRICAL COMPONENTS 8 89 EAS27970 ELECTRICAL COMPONENTS 1 5 4 6 7 9 8 10 11 12 13 15 2 3 14 ...
Page 498: ...ELECTRICAL COMPONENTS 8 91 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ...
Page 530: ......
Page 531: ......
Page 532: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...