FRONT BRAKE
4-37
d. Measure the brake disc deflection.
e. If out of specification, repeat the adjustment
steps until the brake disc deflection is within
specification.
f. If the brake disc deflection cannot be brought
within specification, replace the brake disc.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
6. Install:
• Front wheel
Refer to “FRONT WHEEL” on page 4-15.
EAS22270
REPLACING THE FRONT BRAKE PADS
The following procedure applies to both brake
calipers.
NOTE:
When replacing the brake pads, it is not neces-
sary to disconnect the brake hose or disassem-
ble the brake caliper.
1. Measure:
• Brake pad wear limit “a”
Out of specification
→
Replace the brake
pads as a set.
2. Install:
• Brake pad shims
(onto the brake pads)
• Brake pads
• Brake pad spring
NOTE:
Always install new brake pads, brake pad shims,
and a brake pad spring as a set.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Connect a clear plastic hose “1” tightly to the
bleed screw “2”. Put the other end of the hose
into an open container.
b. Loosen the bleed screw and push the brake
caliper pistons into the brake caliper with your
finger.
c. Tighten the bleed screw.
d. Install a new brake pad shim onto each new
brake pad.
e. Install new brake pads and a new brake pad
spring.
NOTE:
The arrow mark “a” on the brake pad spring
must point in the direction of disc rotation.
Brake pad lining thickness (in-
ner)
5.5 mm (0.22 in)
Limit
0.5 mm (0.02 in)
Brake pad lining thickness (out-
er)
5.5 mm (0.22 in)
Limit
0.5 mm (0.02 in)
T
R
.
Bleed screw (front brake caliper)
6 Nm (0.6 m·kg, 4.3ft·lb)
a
2
1
Summary of Contents for ROADLINER XV19SW
Page 7: ......
Page 9: ......
Page 25: ...SPECIAL TOOLS 1 15...
Page 56: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30...
Page 61: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 D D B B D D C C A A B C C B 3 2 1 3 4 6 7 6 7 5...
Page 63: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 A A A A 1 3 2 4...
Page 65: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 A 1 2 3 4...
Page 67: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 A A A 1 5 5 1 3 2 4 B B B B...
Page 69: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 43 1 2...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 44 1 Transfer gear oil pump 2 Middle driven shaft...
Page 79: ...CABLE ROUTING 2 53...
Page 87: ...CABLE ROUTING 2 61...
Page 90: ......
Page 123: ...ELECTRICAL SYSTEM 3 33 a b 1...
Page 126: ......
Page 148: ...FRONT WHEEL 4 22...
Page 185: ...HANDLEBAR 4 59 Throttle cable free play 4 0 6 0 mm 0 16 0 24 in...
Page 288: ...GENERATOR AND STARTER CLUTCH 5 76 Yamaha bond No 1215 90890 85505 Three Bond No 1215...
Page 344: ......
Page 350: ...IGNITION SYSTEM 7 6...
Page 358: ...CHARGING SYSTEM 7 14 1 AC magneto 2 Rectifier regulator 4 Main fuse 6 Battery...
Page 360: ...CHARGING SYSTEM 7 16...
Page 411: ...ELECTRICAL COMPONENTS 7 67 EAS27970 ELECTRICAL COMPONENTS 11 3 6 7 8 10 4 9 12 13 5 2 1 14...
Page 413: ...ELECTRICAL COMPONENTS 7 69 16 18 2 11 13 9 8 10 12 14 15 17 1 3 4 5 6 7...
Page 443: ......
Page 444: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...