Periodic maintenance and adjustment
75
5.
Pull the V-belt up over the secondary
fixed sheave.
6.
Remove the V-belt from the secondary
sheave assembly and primary sheave
assembly.
7.
Install the new V-belt over the primary
sheave assembly.
8.
Rotate the secondary sliding sheave
clockwise and push it so that it separates
from the secondary fixed sheave.
9.
Install the V-belt between the secondary
fixed sheave and the secondary sliding
sheave.
10. Install the drive guard.
11. Install the left side cover (PZ50RT /
PZ50GT / PZ50MT), or install the left side
cover and the left upper cover, and then
close the shroud (PZ50VT / PZ50MP).
ESU12126
Drive chain housing
To check the drive chain housing oil
level
1.
Place the snowmobile on a level surface
and apply the parking brake.
2.
Remove the right side cover. (See page
60 for removal procedures.)
3.
Remove the dipstick, wipe it off with a
clean rag, and then insert it back into the
filler hole.
1. Secondary sliding sheave
2. Secondary fixed sheave
1. V-belt
1. Secondary sliding sheave
2. Secondary fixed sheave
1. V-belt
U8GKS6E0.book Page 75 Tuesday, April 17, 2012 8:48 AM