139
Using the DigiLink cable, connect PRIMARY PORT on HD I/O and PORT 1 connector on HDX
card.
Next, connect Loop Sync (LS) on HD I/O and that on Sync HD, by connecting LS OUT on Sync HD
and LS IN on HD I/O and connecting LS OUT on HD I/O and LS IN on Sync HD, using BNC
cables.
By using XLR cables, connect TIMECODE OUT on SyncStation and LTC IN on Sync HD.
Similarly, connect LTC OUT on Sync HD and TIMECODE IN on SyncStation.
Summary of Contents for NUAGE
Page 1: ...Nuage Setup Guide Version 1 8 ...
Page 10: ...10 Nuage Master rear Nuage Master front Nuage Master side Nuage Workspace Small rear ...
Page 56: ...56 Nuage Workgroup Manager NIO Properties Dante Controller Clock Status window ...
Page 60: ...60 Software License Agreement Choose Install Location ...
Page 61: ...61 Enter Password to Proceed Installation Completed Installation of NUENDO is now complete ...
Page 63: ...63 Software License Agreement Choose Programs To Be Installed ...
Page 64: ...64 Check Disk Space and Start Installation Password Required Installations Completed ...
Page 70: ...70 Choose Install Location Enter Password to proceed Installation Completed ...
Page 72: ...72 Follow the steps in the installation window License Agreement Downloading QuickTime 7 7 9 ...
Page 74: ...74 Follow the steps in the installation window Bonjour Installer License Agreement ...
Page 75: ...75 System Requirements etc Installation Options Installation Completed ...
Page 147: ...147 ...
Page 149: ...149 Front Speakers Left Center Right Side Rear Speakers Left Surround Side Left ...
Page 150: ...150 Ceiling Speakers Top Side Left Top Side Right Subwoofer Lfe ...
Page 154: ...154 NUAGE Fader Section Control Section Control 1 ...
Page 155: ...155 Section Control 2 Section Control 3 Section Control 4 Section Control 5 ...
Page 159: ......