4. Factory set procedure
• Locations of Starting keys
<n8>
Starting keys
<n12>
Starting keys
Turning on the power while holding down the three keys,
[MUTE], [2TR] and [ST], simultaneously initializes the
information data of 1394 wiring stored in the EEPROM on the
MLAN circuit board and Sweet Spot Data stored in the
fl
ash
ROM on the DM circuit board.
(1) Turn on the power while holding down the three keys,
[MUTE], [2TR] and [ST], simultaneously.
(2) The firmware version will be shown on the MASTER
LEVEL METER.
(3) Release the switches which had been held.
(4) After the COMP LED flashes several times, normal
condition will be restored.
(5) Now the initialization of the Sweet Spot Data is
fi
nished.
(6) Then, initialization of the information data of 1394 wiring
stored in the EEPROM on the MLAN circuit board will
be started.
The LEDs in the MASTER LEVEL METER will light
sequentially.
(7) When the sequential lighting of the LEDs in the MASTER
LEVEL METER is
fi
nished, initialization of the information
data of 1394 wiring stored in the EEPROM on the MLAN
circuit board is
fi
nished.
*
Do not turn off the power until the sequential lighting of
the LEDs in the MASTER LEVEL METER is
fi
nished.
*
User data stored in the Sweep Spot Data area will be
deleted.
Summary of Contents for N12 - n12 Digital Mixing Studio
Page 16: ...n8 n12 16 DIMENSIONS 寸法図 145 8 515 0 560 8 368 145 31 517 14 n12 n8 Unit 単位 mm ...
Page 46: ...n8 n12 46 B B DM A Circuit Board n8 DM B Circuit Board n12 DM A DM B 2NA WH29160 1 ...
Page 57: ...57 n8 n12 E E PN A PN B 2NA WH17690 Component side 部品側 Scale 66 100 ...
Page 60: ...n8 n12 60 F F PN A Circuit Board n8 PN B Circuit Board n12 PN A PN B 2NA WH17690 ...
Page 61: ...61 n8 n12 F F Pattern side パターン側 Scale 70 100 PN A PN B 2NA WH17690 ...
Page 63: ...63 n8 n12 G G H H Component side 部品側 Pattern side パターン側 Scale 75 100 PNSB 2NA WH17720 2 ...