3-39
ENG
2. Measure:
9
Piston clearance
Out of specifications
→
Rebore or
replace the cylinder, and then replace
the piston and piston rings.
Piston clearance =
Cylinder inside diameter –
Piston skirt diameter
Piston clearance:
Refer to “SPECIFICATIONS” in
the Supplementary service
manual.
Limit:
Refer to “SPECIFICATIONS” in
the Supplementary service
manual.
PISTON, CAMSHAFT, CRANKCASE, AND
CRANKSHAFT
CHECKING THE PISTON AND PISTON PIN
1. Measure:
9
Piston skirt diameter
P
a
= 10 mm (0.4 in) from the piston
bottom edge
Out of specification
→
Replace.
Piston skirt diameter:
Refer to “SPECIFICATIONS” in
the Supplementary service
manual.
Limit:
Refer to “SPECIFICATIONS” in
the Supplementary service
manual.
307-001
a
P
Summary of Contents for MZ250
Page 1: ...MZ250 MZ300 SERVICE MANUAL 7VB F8197 10 LIT 19616 01 80 cover indd 1 2012 10 30 12 01 25 ...
Page 2: ...cover indd 2 2012 10 30 12 01 25 ...
Page 6: ......
Page 10: ...CHAPTER 6 TROUBLESHOOTING ENGINE 6 1 ...
Page 40: ...3 6 ENG FUEL TANK CANISTER CHECKING THE CANISTER 1 Check 9 Canister 1 Cracks damage Replace 1 ...
Page 116: ...6 9 TRBL ...
Page 117: ...cover indd 3 2012 10 30 12 01 25 ...