3-8
ENG
MUFFLER
1
2
3
INSTALLING THE MUFFLER
1. Install:
9
Gasket
9
Muffler assembly
9
Muffler nut
1
9
Muffler nut
2
9
Muffler bolt
3
TIP
Temporarily tighten the nut
1
, nut
2
, and bolt
3
until just comes in contact with the surface.
2. Tighten:
9
Muffler nut
1
9
Muffler nut
2
Muffler nut:
Refer to “TIGHTENING TORQUES”
in the Supplementary service
manual.
9
Muffler bolt
3
Muffler bolt:
Refer to “TIGHTENING TORQUES”
in the Supplementary service
manual.
TIP
Tighten the nuts and bolt to the specified
torque in order of muffler nut
1
, muffler nut
2
,
and muffler bolt
3
.
Summary of Contents for MZ250
Page 1: ...MZ250 MZ300 SERVICE MANUAL 7VB F8197 10 LIT 19616 01 80 cover indd 1 2012 10 30 12 01 25 ...
Page 2: ...cover indd 2 2012 10 30 12 01 25 ...
Page 6: ......
Page 10: ...CHAPTER 6 TROUBLESHOOTING ENGINE 6 1 ...
Page 40: ...3 6 ENG FUEL TANK CANISTER CHECKING THE CANISTER 1 Check 9 Canister 1 Cracks damage Replace 1 ...
Page 116: ...6 9 TRBL ...
Page 117: ...cover indd 3 2012 10 30 12 01 25 ...