FRONT WHEEL
4-24
4. Check:
• Front wheel static balance
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Turn the front wheel and make sure it stays at
each position shown.
b. If the front wheel does not remain stationary
at all of the positions, rebalance it.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
EAS2DM1004
INSTALLING THE FRONT WHEEL (FRONT
BRAKE DISC) (for YP125R)
1. Install:
• Front brake disc “1”
TIP
• Install the brake disc so that the recessed por-
tion of the bolt hole faces away from the hub.
• Tighten the brake disc bolts in stages and in a
crisscross pattern.
2. Check:
• Front brake disc
Refer to “CHECKING THE FRONT BRAKE
DISC” on page 4-37.
3. Lubricate:
• Oil seal lips
• Speed sensor oil seal lip
4. Install:
• Collar
• Speed sensor
• Front wheel
TIP
• Make sure that the projection “a” on the wheel
hub do not contact the projections “b” on the
speed sensor.
• When installing the speed sensor, make sure
that the projection on the wheel hub does not
damage the lip of the speed sensor oil seal.
• Make sure that the slot “c” in the speed sensor
fits over the stopper “d” on the outer tube.
5. Install:
• Wheel axle
• Wheel axle pinch bolt
T
R
.
.
Front brake disc bolt
12 Nm (1.2 m·kgf, 8.7 ft·lbf)
LOCTITE®
1
Recommended lubricant
Lithium-soap-based grease
T
R
.
.
Wheel axle
59 Nm (5.9 m·kgf, 43 ft·lbf)
Wheel axle pinch bolt
23 Nm (2.3 m·kgf, 17 ft·lbf)
a
b
c
d
Summary of Contents for MBK XMAX 2014
Page 1: ...2014 SERVICE MANUAL YP125R YP125RA 2DM F8197 E0 ...
Page 6: ......
Page 8: ......
Page 64: ...TIGHTENING TORQUES 2 17 Muffler tightening sequence 1 2 3 ...
Page 72: ...LUBRICATION SYSTEM DIAGRAMS 2 25 EAS2DM1116 LUBRICATION SYSTEM DIAGRAMS 1 2 3 4 5 3 ...
Page 78: ...CABLE ROUTING 2 31 Steering head front view 1 2 3 4 5 6 8 8 A 7 7 ...
Page 80: ...CABLE ROUTING 2 33 Front brake left side view for YP125R 1 2 2 1 1 2 2 D E A B C ...
Page 82: ...CABLE ROUTING 2 35 Front brake left side view for YP125RA 2 1 1 2 1 2 2 A B D E C ...
Page 92: ...CABLE ROUTING 2 45 Frame right side view 3 2 4 1 2 3 A B 6 5 3 A B 3 3 2 3 3 A A B A B B 3 ...
Page 94: ...CABLE ROUTING 2 47 Engine right side view 6 6 6 6 C D C D D C 10 B 9 5 6 1 2 8 3 4 5 6 7 A ...
Page 98: ...CABLE ROUTING 2 51 Frame left side view C D C D 2 1 E 1 2 D C 6 1 4 5 3 2 1 7 3 2 1 A B ...
Page 100: ...CABLE ROUTING 2 53 Engine left side view 1 1 1 1 1 2 3 4 5 6 7 8 9 7 7 A B A B A B 1 ...
Page 106: ...CABLE ROUTING 2 59 Rear brake right side view 2 2 2 2 2 2 1 1 2 3 A B C 3 ...
Page 110: ...CABLE ROUTING 2 63 ...
Page 228: ...REAR SHOCK ABSORBER ASSEMBLIES AND SWINGARM 4 89 ...
Page 231: ......
Page 291: ...CRANKSHAFT 5 60 a 1 ...
Page 292: ...CRANKSHAFT 5 61 ...
Page 302: ...WATER PUMP 6 9 ...
Page 313: ......
Page 331: ...CHARGING SYSTEM 8 18 ...
Page 349: ...COOLING SYSTEM 8 36 ...
Page 391: ...FUEL PUMP SYSTEM 8 78 ...
Page 400: ...IMMOBILIZER SYSTEM 8 87 a Light on b Light off ...
Page 401: ...IMMOBILIZER SYSTEM 8 88 ...
Page 405: ...ABS ANTI LOCK BRAKE SYSTEM for YP125RA 8 92 ...
Page 439: ...ABS ANTI LOCK BRAKE SYSTEM for YP125RA 8 126 ...
Page 464: ...ELECTRICAL COMPONENTS 8 151 ...
Page 476: ......
Page 477: ......
Page 478: ......