
5-28
POWR
E
STARTER MOTOR
STARTER MOTOR
5
REMOVING/INSTALLING THE STARTER MOTOR
5
Order
Job/Part
Q’ty
Remarks
Positive battery lead
Refer to “POWER UNIT” on page 5-4.
Power trim and tilt lead (red) and
starter motor lead
Refer to “JUNCTION BOX ASSEMBLY”
on page 5-18.
1
Bolt
3
2
Starter motor
1
For installation, reverse the removal
procedure.
5190