9-56
9
3. Install the battery holding plate by installing
the nuts.
4. Install the front carrier by installing the bolts
and tightening them to the specified torques.
5. Install the panel.
TIP
Make sure the positive and negative battery
leads are installed as shown.
Fully charge the battery before installing it.
EBU30525
Replacing a fuse
1. Positive battery lead (red)
2. Negative battery lead (black)
Tightening torques:
Carrier bolt (upper):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (lower):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (under the fenders):
7 N·m (0.7 kgf·m, 5.2 lb·ft)
1
2
1. Fuse box
2. Main fuse
3. EPS fuse (equipped models)
4. Fuel injection system spare fuse
5. Fuel injection system fuse
2
3
4
5
1
UB5K62E0.book Page 56 Thursday, May 9, 2019 2:59 PM
Summary of Contents for KODIAK 2019
Page 14: ...2 2 2 For Europe 1 2 3 4 5 11 9 10 7 8 6 UB5K62E0 book Page 2 Thursday May 9 2019 2 59 PM ...
Page 20: ...2 8 2 For Oceania 3 5 4 9 6 7 8 1 2 UB5K62E0 book Page 8 Thursday May 9 2019 2 59 PM ...
Page 75: ...8 1 8 EBU21142 RIDING YOUR ATV UB5K62E0 book Page 1 Thursday May 9 2019 2 59 PM ...