8-13
8
2. Install the front carrier by installing the bolts
and tightening them to the specified torques.
3. Install panel A.
Panel C
To remove the panel
1. Remove the seat. (See page 4-17.)
2. Remove panel A.
3. Remove the hoses from panel C.
4. Remove the quick fasteners and bolts.
Tightening torques:
Carrier bolt (upper):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (lower):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (under the fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
1. Hose
1
1
U2UD60E0.book Page 13 Tuesday, April 28, 2015 11:55 AM