![Yamaha Grizzly 700 2011 Manual Download Page 148](http://html1.mh-extra.com/html/yamaha/grizzly-700-2011/grizzly-700-2011_manual_3536258148.webp)
8-59
8
2. Connect the positive battery lead first, then
connect the negative battery lead by installing
their bolt.
NOTICE:
When installing the bat-
tery, the main switch must be off, and the
positive lead must be connected before
the negative lead.
[ECB01110]
3. Install the battery holding plate by installing
the nuts.
4. Install the front carrier by installing the bolts
and tightening them to the specified torques.
5. Install the panel.
EBU30520
Replacing a fuse
1. Positive battery lead (red)
2. Negative battery lead (black)
1
2
Tightening torques:
Carrier bolt (top):
34 Nm (3.4 m·kgf, 25 ft·lbf)
Carrier bolt (under the fenders):
7 Nm (0.7 m·kgf, 5.1 ft·lbf)
1. Fuse box
2. Main fuse
3. EPS fuse
4. Fuel injection system spare fuse
5. Fuel injection system fuse
U1HP60E0.book Page 59 Monday, April 11, 2011 7:56 PM
Summary of Contents for Grizzly 700 2011
Page 2: ...PRINTED IN USA 2011 05 0 8 1 CR E F S DIC183 ...
Page 18: ...1 8 1 For Oceania 1 2 3 4 6 7 9 8 10 5 5 U1HP60E0 book Page 8 Monday April 11 2011 7 56 PM ...
Page 67: ...7 1 7 EBU21141 RIDING YOUR ATV U1HP60E0 book Page 1 Monday April 11 2011 7 56 PM ...
Page 171: ...U1HP60E0 book Page 3 Monday April 11 2011 7 56 PM ...
Page 172: ...PRINTED IN USA 2011 05 0 8 1 CR E U1HP60E0 book Page 1 Monday April 11 2011 7 56 PM ...