10-19
General periodic maintenance
d.
Remove the gear oil pump, and then install
a new gasket “1” and the drain screw “2”.
TIP:
Before installing the magnetic drain screw,
make sure to remove all metal particles.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Checking the gear oil level
1.
Check the gear oil level. See “Checking
the gear oil level” (10-8).
Greasing points
1.
Apply:
• Specified lubrication points
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Apply water resistant grease to the speci-
fied lubrication points.
Gear oil quantity
0.430 L (0.455 US qt, 0.378
Imp.qt)
Oil level plug “2”
7 N·m (0.7 kgf·m, 5.2 lb·ft)
Drain screw “2”
7 N·m (0.7 kgf·m, 5.2 lb·ft)
T
R
.
.
2
1
T
R
.
.
Summary of Contents for F30B 2018
Page 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Page 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Page 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Page 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Page 342: ...Jul 2018 ABE E ...