6-23
Vapor separator and high-pressure fuel pump
2.
Adjust:
• Float height “a”
• Float height “b”
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Bend portions “1” of the float to adjust the
float height to specification “a”.
b.
Bend portions “1” of the float to adjust the
float height to specification “b”.
TIP:
• Do not bend the lever “2”.
• Bend both portions of “1” equally.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Assembling the vapor separator
1.
Assemble:
• Vapor separator
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a.
Install the plates “1” and “2”, and then tight-
en the float chamber plate screws “3” to
the specified torque.
b.
Install the needle valve “1”, float “2”, and
float pin “3”.
TIP:
• Do not reuse the float pin. Always replace it
with a new one.
• Install the float pin with its tapered end facing
towards the mark “a” on the float chamber
cover.
Float height
40.7–42.7 mm (1.60–1.68 in)
Float height (reference data)
30.7 mm (1.21 in)
a
1
1
b
2
Float chamber plate screw “3”
2.0 N·m (0.20 kgf·m, 1.5 lb·ft)
3
3
2
1
T
R
.
.
1
2
Summary of Contents for F30A 2018
Page 1: ...6BG 28197 ZX 11 LIT 18616 03 84 USA CAN AUS and NZL Worldwide 6BG 6BT 6BG 6BT ...
Page 22: ...1 Specification Specification data 1 1 External dimensions 1 1 Clamp bracket dimensions 1 9 ...
Page 35: ...2 3 Electronic control system Electrical components 3 4 5 6 7 8 9 10 11 1 2 ...
Page 178: ...7 23 Wire harness 2 3 1 a c b 3 4 5 ...
Page 342: ...Jul 2018 ABE E ...