7-11
POWR
Power unit
28. Remove the power unit mounting bolts
V
and
W
, and then remove the power unit
U
, gasket
X
, and dowels
Y
.
Installing the power unit
Before installing the power unit, make sure to
install the shift rod and shift bracket onto the
bottom cowling. See “Shift rod and shift
bracket” (9-1).
Do not reuse a gasket or O-ring, always
replace it with a new one.
1.
Retract the cowling lock levers (PORT
and STBD).
NOTICE:
Make sure that
the cowling lock levers are retracted
and the engine stoppers are installed
before installing the power unit. Oth-
erwise, the fuel rails could be dam-
aged.
2.
Clean the power unit mating surface, and
then the install the dowels
1
and a new
gasket
2
.
3.
Hook a lifting harness to the engine
hangers
3
, and then suspend the power
unit
4
.
4.
Install the power unit
4
, and then tighten
the power unit mounting bolts
5
and
6
to the specified torque.
W
W
V
V
V
Y
T
U
T
W
V
V
V
Y
X
Power unit mounting bolt
5
and
6
:
42 N·m (4.2 kgf·m, 31.0 ft·lb)
T
POR
STBD
5
6
6
5
5
1
2
4
5
5
5
6
3
3
3
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...