5-76
5
5.
Remove the fuse holder
2
, and then dis-
connect the fuse holder coupler
e
.
6.
Disconnect the PTT relay coupler
f
.
7.
Check the wiring harness for continuity.
8.
Connect the PTT relay coupler.
9.
Connect the fuse holder coupler, and
then install the fuse holder.
10. Install the intake manifold (STBD). See
“Installing the intake manifold” (6-18).
11. Connect the PTT switch coupler.
Checking the trim sensor
1.
Remove the trim sensor, and then dis-
connect the trim sensor coupler
a
.
2.
Turn the trim sensor lever
b
from the
position
c
to the position
d
, and then
measure the resistance as it gradually
changes.
3.
Disconnect the alert indicator coupler
e
.
Wiring harness continuity:
a
Terminal 1–
f
Terminal 1
a
Terminal 2–
f
Terminal 2
a
Terminal 3–
e
Terminal 4
2
e
f
e
a
f
1
2
3
4
2 1
Trim sensor resistance (reference data):
Pink (P)–Black (B)
247.6–387.6
Ω
at position
c
9.0–11.0
Ω
at position
d
(setting
resistance)
a
B
P
b
c
d
a
a
e
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...