5-51
ELEC
Electrical system
8.
Install the intake manifold (STBD). See
“Installing the intake manifold” (6-18).
Checking the Rectifier Regulator
Do not connect the battery cables in
reverse. Otherwise, the Rectifier Regula-
tor could be damaged.
1.
Remove the fuse cover
1
.
2.
Measure the Rectifier Regulator output
peak voltage.
TIP:
Do not use peak voltage adapter B when
measuring the Rectifier Regulator output
peak voltage.
3.
Install the fuse cover.
4.
Remove the intake manifold (STBD).
See “Removing the intake manifold” (6-
17).
5.
Remove the fuse holder, and then dis-
connect the Rectifier Regulator couplers
and ground lead.
6.
Set the digital circuit tester to the mea-
surement range
a
, and then push the
switch
b
to display the mark
c
.
È
Tester model CD721
É
Tester model CD731a
Rectifier Regulator output peak voltage:
Fuse (60 A)–Ground
r/min
Loaded
1500
3500
DC V
13.0
13.0
1
a
b
È
c
É
a
c
b
Summary of Contents for F200B
Page 1: ...F200B FL200B F250G FL250G SERVICE MANUAL 6DX 28197 5P 11 ...
Page 4: ......
Page 21: ...0 16 0 Tilt rod wrench 90890 06569 Special service tool ...
Page 207: ...5 78 5 MEMO PTT electrical system ...
Page 359: ...7 100 7 MEMO Cylinder block ...
Page 386: ...LOWR Lower unit 8 23 2 Install the rubber seal 1 1 ...
Page 407: ...8 44 8 Shim location F250G P F R T3 T1 T2 T4 Shimming regular rotation model ...
Page 461: ...8 98 8 Shim location FL250G F R P T3 T4 T2 T1 Shimming counter rotation model ...
Page 473: ...8 110 8 MEMO Shimming counter rotation model ...
Page 566: ...A 1 MEMO ...
Page 569: ......
Page 570: ...Jul 2011 1 CR E ...