5-16
Engine control units and components
0
1
2
3
4
5
6
7
8
9
10
A
5.
Turn the engine start switch to “OFF.”
6.
Remove the main relay.
7.
Check the wiring harness for continuity.
8.
Install the main relay.
9.
Connect the engine ECM coupler
a
, and
then install the junction box cover.
Checking the TPS
1.
Connect the YDIS to display “Throttle
position sensor.”
2.
Start the engine and warm up, and then
turn it off.
3.
Turn the engine start switch to “ON,” and
then measure the output voltages of TPS
and the throttle valve opening angle
when the remote control lever is at the
fully closed position
a
and fully open
position
b
.
Engine ECM input voltage
(reference data):
Terminal 13–Ground
11.2 V
Wiring harness continuity:
Terminal 16–Terminal
b
Terminal 30–Terminal
c
a
13
a
16
30
c
b
TPS out put voltage and throttle
valve opening angle (reference data):
Fully closed
a
Fully open
b
Output
voltage
0.703 V
4.255 V
Opening
angle
0.1°
88.6°
F
N
a
b
R
Summary of Contents for F150B
Page 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Page 4: ......
Page 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Page 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Page 448: ...A 1 MEMO ...
Page 451: ......
Page 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Page 458: ......