9-9
PTT switch and cowling lock lever
2.
Pass the flushing hose “2”, trim sensor
lead “3”, and PTT motor leads “4”
through the grommet “1”, and then fasten
them using the plastic ties “5” around the
grommet “1”.
TIP:
Align the white paint mark “a” on the flushing
hose “2” with the outer end of the grommet
“1”.
3.
Install the flushing hose adapter “1”, and
then tighten the flushing hose adapter
screws “2” to the specified torque.
4.
Route the flushing hose through the hose
joint “3”, install it to the hose joint “4”, and
then fasten the flushing hose “5” using
the plastic tie “6”.
5.
Install the hose joint to the adapter “1”
along with the gasket “7”.
Installing the cowling lock lever
1.
Install the cowling lock lever “1” and lever
“2”.
2.
Install the spring “1”.
3.
Inject grease into the housing “1” until
grease comes out from the cowling lock
lever bushing.
Installing the PTT switch
1.
Install the gasket “1”, PTT switch “2”, and
holder “3”.
2
2
1
1
5
5
5
5
3
3
4
4
a
1
2
4
3
5
6
7
Flushing hose adapter screw “2”:
5 N·m (0.5 kgf·m, 3.7 ft·lb)
1
2
1
1
Summary of Contents for F150A
Page 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Page 4: ......
Page 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Page 110: ...3 41 Propeller selection MEMO ...
Page 129: ...4 18 Outboard motor troubleshooting MEMO ...
Page 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Page 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Page 475: ......
Page 476: ...Oct 2011 2 ABE E ...