9-8
PTT switch and cowling lock lever
0
1
2
3
4
5
6
7
8
9
10
A
Removing the PTT switch
1.
Remove the holder “1”, and then remove
the PTT switch “2”.
A. Regular rotation model
B. Counter rotation model
Removing the cowling lock lever
1.
Remove the spring “1”.
2.
Remove the lever “1” and cowling lock
lever “2”.
Removing the flushing hose
1.
Remove the adapter “1” and hose joints
“2”, and “3”.
2.
Remove the flushing hose “1”, PTT motor
leads “a”, trim sensor lead “b”, and grom-
met “2”.
Installing the flushing hose
1.
Install the grommet “1” to the bottom
cowling.
STBD
1
2
A
PORT
1
2
B
1
1
2
1
2
3
2
a
b
1
Summary of Contents for F150A
Page 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Page 4: ......
Page 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Page 110: ...3 41 Propeller selection MEMO ...
Page 129: ...4 18 Outboard motor troubleshooting MEMO ...
Page 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Page 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Page 475: ......
Page 476: ...Oct 2011 2 ABE E ...