1. Machine installation requirements
Confirm the following machine installation requirements and install the machine where
the following conditions are satisfied.
Air
Item
Detail
Remark
Air pressure
Supply air pressure: 0.45MPa or more
8.5mm ×
12.5mm hose
Condition
・
50L / min.A.N.R. (4-head type)
・
75L / min.A.N.R. (6-head type)
・
140L / min.A.N.R. (12-head type)
Clean air (Removed moisture, oil and dust)
Power supply
Item
Detail
Remark
Power supply
Three-phase alternating current 200 / 208 / 220 /
240 / 380 / 400 / 416 / 440V (+/-10%)
Frequency
50Hz / 60Hz
Power capacity
S10
:
6.4 KVA
S20
:
6.8 KVA
M10
:
5.5 KVA
M20
:
5.9 KVA
D10
:
5.5 KVA
D10 =5.5KVA
Power cable (equivalent to VCT 4 × 3.5mm
2
)
Power supply
connection
Power cable conductor cross-section 3.5mm
2
or
more
Leakage current 20mA or less
Installation environment requirement
Item
Detail
Remark
Noise
Meeting EN61000-6-2 standard
Humidity
50 ~ 60% (non-condensing)
Temperature
Operation assurance: Within the range from 10 to 35 degrees C
Accuracy assurance : 23+/-2 degrees C
The average over a period of 24
hours does not exceed 30 degrees C
Altitude
1,000m or below above sea level
Floor
The floor must be flat and has the enough strength of enduring
the vibration of the machine during the operation.
Note:
If the machine that is the source of noise locates in the line configuration, do not share
the power supply and the ground wire.
Connect the power supply to the separate lineage from the power distribution
panel.
Install the ground wire individually.
Note:
If the strong light from the indoor lightings, the direct sunlight and etc., may enter the machine
due to the machine configuration, note that the lights may adversely affect to the image processing.